Laserfiche WebLink
2019 Reclamation Cost Estimate Update—Henderson Mine& Mill <br /> Following regrading, the disturbed area will be revegetated by the drill seed method and plants and trees <br /> will be planted across approximately 110 acres. <br /> 2.6 Mill Yard and Access Road <br /> The Mill Yard and Access Road will be regraded and reclaimed. As such, and following demolition of the <br /> Mill buildings and associated infrastructure (covered under the Mill Site Demo task), the Mill Yard and <br /> (site) Access Road will be regraded (approximately 182,000 cy and 60,000 cy, respectively) to blend with <br /> the adjacent terrain and to meet natural drainage patterns. Following regrading, the disturbed area of over <br /> 120 acres will be revegetated by the drill seed method and plants and trees will be planted. <br /> 2.7 East Branch, Horseshoe and Ute Creek Reservoirs <br /> The East Branch Reservoir is currently used for reclaim water storage, but it will be reclaimed after it is no <br /> longer needed for production operations and converted to a fresh water reservoir. Final reclamation will <br /> involve excavation of up to 20,000 cy of sediment. For all 3 reservoirs, it is anticipated that a nominal <br /> amount of maintenance fertilization will be required for the access roads to the facilities, approximately 5 <br /> acres total. <br /> 2.8 Tailing Deposition Area <br /> The TDA will be reclaimed when it is no longer required for production operations using a dry cover. The <br /> entire top surface will be capped and revegetated. <br /> The borrow areas, roads, and tailing dams will be regraded. Additional fill may be required for the tailing <br /> impoundment to account for any settlement. Rock armor will be placed over the embankment/dam area, <br /> as required. A new spillway will be excavated through native ground to the north which will drain to <br /> Ranger Gulch or down the left tailing dam abutment. <br /> The dry beach area will be capped with a minimum of 24 inches of cover material over 685 acres for a <br /> total of approximately 2,210,000 cy. The wet slimes and pond footprint area will be capped with a multi- <br /> layer system likely to include a geogrid layer under a minimum of 24 inches of cover material over 542 <br /> acres for a total of approximately 1,749,000 cy. The area will be hydroseeded and trees and shrubs will <br /> be planted. <br /> Additional reclamation tasks include the construction of an inlet structure for the new spillway and <br /> removal of the barge and its associated systems. Finally, diversion channels will be constructed to convey <br /> stormwater around and off the reclaimed top surface of the TDA. The diversion channels will include <br /> nonwoven geotextile and riprap liners. The Ultimate Canal will likely remain post closure to assist with the <br /> diversion of large stormwater events around the reclaimed TDA. <br /> 2.9 Main Gravel Pit below 1-Dam <br /> The gravel pit below 1-Dam will be reclaimed in accordance with a standard regrade, cover and <br /> revegetation approach. Regrading of the quarry will result in slopes no steeper than 2HAV with some <br /> areas considerably less steep, for a total of approximately 64,000 cy. This will be followed by the haulage <br /> and placement of approximately 15,000 cy of topsoil. Revegetation by drill seeding and the planting of <br /> trees and shrubs will occur over the 40-acre footprint. <br /> 2.10 Laydown Yard at Rectifier 6 <br /> The Laydown Yard at Rectifier 6 will be reclaimed in accordance with a standard regrade and <br /> revegetation approach. Regrading of the yard will require a total quantity of approximately 27,000 cy. This <br /> will be followed with revegetation of the regraded surface by drill seeding and the planting of trees and <br /> shrubs over the 5-acre footprint. <br /> 2.11 Mill Site Demolition <br /> Structures at the Mill site not to be used post mining will no longer be required during the post- <br /> reclamation period and will be demolished. These structures include the Primary Conveyor 2 (PC2)/PC3 <br /> Transfer Building, PC3/SC1 Transfer Building, Conveyor (Loci) Maintenance Shop, Tailing and <br /> 3 Dec 2019 <br />