My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-06_HYDROLOGY - M1977342
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977342
>
2019-12-06_HYDROLOGY - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 7:46:28 AM
Creation date
12/6/2019 3:26:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Hydrology
Doc Date
12/6/2019
Doc Name
Reclamation Cost Estimate
From
Climax Molybdenum
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Cost Estimate Update(12/2/2019)-Henderson Mine and Mill <br /> DEMOLITION Material List for Reclamation Cost Model <br /> Material Cost/Unit Materials Units Source Section <br /> steel $ 0.28 cuft RSMeans 2019 0241 16.13 0020 <br /> concrete floor $ 0.58 sgft RSMeans 2019 0241 16.17 0240 <br /> concrete footing $ 9.71 LF RSMeans 2019 0241 16.17 1000 <br /> asphalt $ 4.31 sgyd RSMeans 2019 0241 13.17 5010 <br /> pipe grouting $ 31.00 cult RSMeans 2019 31 73 13.10 0800 <br /> landfill fee $ 0.68 EA 1%x demolition quantities <br /> 72"+dia.CMP $ 49.00 LF RSMeans 2019 0241 13.40 0200 <br /> steel bridge $ 12.15 sqft RSMeans 2019 0241 16.33 0200 <br /> power poles,x-arms $ 316.50 EA RSMeans 2019 0241 13.80 0100,0300 <br /> TDL concrete pipe $ 36.25 LF RSMeans 2019 0241 13.38 0100 <br /> Overland conveyor $ 0.33 sgft RSMeans 2019 05 05 05.10 0500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.