Laserfiche WebLink
Mr. Jerald Schnabel <br /> November 24, 2019 <br /> Page 3 <br /> 11. Commitments: The DRMS accepts the following two commitments on p. D-4: <br /> a. Technical Revision submittal to address additional grading for potential supplemental <br /> imported fill in the Lower Borrow Area. <br /> b. Technical Revision submittal to address temporary haul roads necessary for <br /> reclamation to be constructed in previously disturbed areas. <br /> 6.4.5 EXHIBIT E—Reclamation Plan <br /> 12. Topsoil Importation: The third paragraph on p. E-2 discusses importing topsoil for <br /> reclamation. The importation of topsoil may have significant reclamation bonding <br /> implications. Please provide an estimate for the required amount of imported topsoil and if a <br /> source has been identified. <br /> 13. Subgrade: The first paragraph on p. E-4 discusses placing a "1.0-foot thick subgrade of <br /> weathered granite" over areas where shot rock remains at the surface. Shot rock can have <br /> significant void space. Please address the following: <br /> a. Will a foot of weathered granite be sufficient to prevent topsoil from being lost to <br /> void spaces in the shot rock? <br /> b. Where is this extra material included in Exhibit L? <br /> 6.4.6 EXHIBIT F—Reclamation Plan Man <br /> 14. Exhibit F Proposed topography: Rule 6.4.6(a) requires topography and contours. Both are <br /> provided,however there are several references to specific elevations in Exhibit D Mining Plan, <br /> Exhibit E Reclamation Plan, and Exhibit L Reclamation Costs. Please resubmit Exhibit F-1 <br /> showing contour labels and identifying contour intervals, also ensuring the entire affected area <br /> is included (Please see Comment No. 6 above). <br /> 15. Reve etation: Exhibit L, Worksheet No. 3 indicates 100 acres will require revegetation. <br /> Exhibit L, Worksheet No. 14A indicates 108 acres will require reseeding. <br /> a. Please explain the 8 acre discrepancy. <br /> b. These 100 or 108 acres need to be identified in Exhibit F, and should include topsoil <br /> and overburden stockpiles containing material to be used in the reclamation. <br /> 16. Exhibit F Final Land Use: Rule 6.4.6(b) requires showing the proposed final land use. Given <br /> the more complex revegetation plan, it will be helpful in understanding the final revegetation <br /> plan if types of vegetation in the disturbance area if these are shown. Please resubmit F-1 <br /> showing the different types of vegetation proposed. <br /> 6.4.6 EXHIBIT G—Water Information <br /> 17. Drainage Features: Various drainage features are discussed in Exhibit G, most of which are <br /> not identified on any maps submitted in Exhibits C, F, or G. Please submit a map identifying <br /> and showing the location of the following: <br /> a. Informal detention basins (ref. 1st paragraph, p. G-3), <br /> C Users,TCV,Documents\Prolectsl_EI Paso\M-77-211 Pikeview Ouarry,AM-04 ReviseRecI,PAR-2019-11-24 M-77-211 docx <br />