My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-06_REVISION - M1985129
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985129
>
2019-12-06_REVISION - M1985129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 3:28:01 PM
Creation date
12/6/2019 1:45:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985129
IBM Index Class Name
REVISION
Doc Date
12/6/2019
Doc Name
Completeness Response
From
Christian Construction
To
DRMS
Type & Sequence
AM2
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT"L" <br /> 6.4.9 Reclamation Cost Information: <br /> Task: Cost per Affected Acres Affected Acres Affected Acres Affected Acres <br /> Acre: Phase A: Phase B: Phase C: Phase D <br /> 28.87 20.13 11.76 15.01 <br /> Grading/Backfilling: $525.00 $15,156.75 $10,658.25 $6,174.00 $7,880.25 <br /> Topsoil Replacement $608.00 $17,552.96 $12,239.04 $7,150.08 $9,126.08 <br /> 3-6 Inches Deep: <br /> Soil Amendments if $180.00 $5,196.60 $3,623.40 $2,116.80 $2,701.80 <br /> Needed: (1) <br /> Seeding& $765.00 $22,085.55 $15,399.45 $8,996.40 $11,482.65 <br /> Mulching <br /> Cost for Phase: (2) $2,078.00 $59,991.86 $41,920.14 $241,437.28 $31,190.78 <br /> Indirect, 23.5% of X 1.235 $74,089.96 $51,771.37 $30,180.04 $38,520.62 <br /> Total Costs: <br /> 1. Soil amendments will be based on soil tests and applied as needed. <br /> Mining will be done in phases. Initially, a bond will be posted for Phase One. If reclamation <br /> has not begun in Phase One by the time Phase Two mining begins(topsoil removal). then the <br /> Phase two bond will be posted. <br /> `= Approximately 13 acres of unmined land remains within the existing 112 Construction <br /> Materials permit. This area has been incorporated into Phase A. Topsoil has been stockpiled for <br /> the existing 112 site reclamation. In addition, a reclamation financial warranty exists for 112 area <br /> reclamation and does not show up in this calculation since it is based on the added affected area <br /> only. The added affected area is approximately 28.87 acres for Phase A(Excludes the remaining <br /> 5 acres of the existing 112 operation and is covered by the existing 112 reclamation bond.) and <br /> 20.13 acres for Phase B, 11.76 acres for Phase C, 15.01 acres for Phase D. <br /> 66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.