My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-06_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2019-12-06_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 3:28:03 PM
Creation date
12/6/2019 12:09:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/6/2019
Doc Name Note
Revised SL19
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Jared Ebert, Tom Medlin, Christine Belka
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1. Summary of Past Bond Releases at Trapper Mine and Acreage Adjustments <br /> Submittal Proposed Released Released Released Reduction in <br /> Decision Area Ph I Area Ph II Area Ph III Liability <br /> Date(s) (acres) (acres) (acres) <br /> Loadout 5 Dec 1985 2 2 2 $0.00 <br /> SL-01 12-Feb-98 21511.7 0.0 $0.00 <br /> (Phl) <br /> 14-Dec-98 <br /> (Ph II) 1,548.0 0.0 $0.00 <br /> SL-02 23-Dec-99 0.0 319.5 0.0 $0.00 <br /> SL-03 19-Apr-02 0.0 592.7 0.0 $0.00 <br /> SL-04 18-Nov-03 0.0 0.0 1,857.7 $821659.00 <br /> SL-05 11-Jun-04 823.9 0.0 0.0 $0.00 <br /> SL-06 6-Sep-05 0.0 819.6*' 0.0 $2,58706.00 <br /> SL-07 16-May-06 0.0 0.0 762.8 $3711146.00 <br /> SL-08 21-Nov-08 476.6 0.0 0.0 $0.00 <br /> SL-09 2-Dec-08 0.0 294.6 0.0 $8981333.00 <br /> SL-10 17-Nov-08 0.0 0.0 305.0 $2281664.00 <br /> SL-11 7-Jan-11 57.8 0.0 0.0 $0.00 *2 <br /> SL-12 27-March-12 0.0 165.5 0.0 $69501.66 <br /> SL-13 27-March-12 0.0 0.0 323.5 $0.00 <br /> TR-109 24-Aug-12 0.0 5.2*3 0.0 0.0 <br /> TR-109 24-Aug-12 -24.8 -17.5*4 -5.9 0.0 <br /> TR-1 I I 24-April-13 -10.4 -4.6*5 0.0 0.0 <br /> SL-14 5-Dec-13 417.8 0.0 0.0 $2106813 97.69 <br /> SL-15 10-Jan-14 120.4 0.0 0.0 $5201670.46 <br /> SL-16 21-Jan-15 0.0 277.80 0.0 $3761228.82 <br /> TR-114 11-May-15 -0.7*6 -0.7 -0.7 0.0 <br /> SL-17 29-Nov-16 0.0 0.0 448.4 $6961737.41 <br /> TR-119 8-Jun-18 -161.4*7 -161.4*7 -161.4* <br /> SL-18 25-July-19 175.3 0.0 0.0 $8581015.48 <br /> TOTALS Not including 4,368.2 31838.7 39529.4 <br /> Lo adout <br /> SL 19 Proposed 0.0 376.1 0.0 $767,029.62 <br /> *I- Changed from 819.1 during review of TR-109 as per DRMS letter of 21 August 2012. <br /> *2- No change in liability occurred in SL-11,the liability amount at the time of the approval of <br /> SL-I I was updated as a result of Midterm Review 6 (MT6). <br /> *3- As per SL-14 findings, acres had not previously been phase II released. <br /> Permit Number C 19 81010 <br /> SL19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.