Laserfiche WebLink
Table 9. Summ ry of Bond Release Parcels and Associated Acres. <br /> Parcel Acres Parcel Acres Parcels Acres <br /> AB 0 9 0.3 AB 12 10.1 AB 13 15.6 <br /> FA 11 46.8 FA 12 94.6 KA 11 57.4 <br /> KA13 29.4 ZA12 46.5 ZA13 75.4 <br /> This proposed decision will release the applicant from Phase II reclamation liability for those <br /> SL19 bond release parcels totaling 376.1 acres. <br /> The current reclamation liability amount, as documented on the proposed decision form for SL 18, is <br /> $21,989,935.35. The Division currently holds a performance bond of$23,400,000.00 <br /> Table 10. Pre SL19 Liability <br /> Phase Bond Release Area Cost Accounting Acres Cost/Acre % <br /> $8J57.7 100 <br /> SL18 Worst Case Bond Estimate $M824X4.12 2430.2 0 % <br /> $3>3.0 <br /> Phase I Bond Release $L7869536.30 547.5 8 40% <br /> $1,223.6 <br /> Phase II Bond Release $3785474.95 309.3 1 5 1 15% <br /> SL18 Required Surety $2199899935.35 <br /> Phase <br /> Bond Acreag <br /> Release e <br /> Phase 1 4386.2 <br /> Phase 2 3 83 8.7 <br /> Phase 3 3529.4 <br /> Table 11: Post SL19 Liability <br /> Cost/Acr <br /> Phase Bond Release Area Cost Accounting Acres e OYO <br /> $81157.7 100 <br /> SL19 Worst Case Bond Estimate Total $195824X4.12 2430.2 0 % <br /> $3>3.0 <br /> Phase I Bond Release $559,291.91 171.4 8 40% <br /> $11223.6 <br /> Phase 11 Bond Release $8389689.74 685.4 5 15% <br /> *Req 376.1 <br /> SL19 Required Surety $2192229905.74 <br /> Post <br /> SL18 Acreag <br /> Acres e <br /> Phase 1 4386.2 <br /> Phase 2 4214.8 <br /> Phase 3 3529.4 <br /> For the Trapper Mine, the current required surety amount for the site is $21,989,935.35 (SL18). The <br /> Permit Number C 1981010 <br /> SL19 <br />