Laserfiche WebLink
o' <br /> v <br /> V1, <br /> ` 4 <br /> 'F x <br /> � fl <br /> E <br /> . f <br /> sl U <br /> s <br /> r .. <br /> 9 <br /> d�'rr <br /> a <br /> i <br /> A <br /> m. <br /> x <br /> ■ <br /> Map]: SL19 proposed phase II bond release parcels. <br /> Permitted topsoil depth replacement on rangeland is 12 inches plus or minus 2 inches (permit <br /> page 4-256). TMI verifies topsoil replacement thickness by scraper load counts. TMI included <br /> a load count for each reclamation parcel in the bond release application. Topsoil replacement <br /> depth verification was conducted during monthly inspections as documented in DRMS inspection <br /> reports as shown in table 4 below. The table shows the date of the DRMS inspection and the <br /> parcels inspected. Parcel AB09 (0.3 acres) lies in the Oak drainage and is not included in table 4 <br /> (below). Typically, no topsoil is placed in reclaimed drainage ways. <br /> Table 4. Summary of Topsoil Verification Dates for SL19 Parcels <br /> Inspection Date Parcels Inspected Inspection Date Parcels Inspected <br /> 15 Nov 2011 FA 11 4 Oct 2012 KA 11 <br /> 16 May 2013 AB 12, FA 12, ZA 12 6 May 2014 AB 13, ZA 13, KA 13 <br /> All parcel areas verified by the Division were within the permitted topsoil replacement thickness <br /> as per TMI's permit. <br /> Permit Number C 1981010 <br /> SL19 <br />