My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-06_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2019-12-06_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 3:26:33 PM
Creation date
12/6/2019 8:54:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/6/2019
Doc Name Note
Revised
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Jared Ebert, Tom Medlin, Christine Belka
Type & Sequence
SL19
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Photo]: Backfilling and <br /> grading operations to <br /> achieve approximate <br /> original contour. <br /> < 5 i, <br /> z <br /> t vlltN .. ,m „i w YCW ,IA <br /> odNN <br /> i V <br /> t <br /> an <br /> 1 4 t <br /> l FI I <br /> " S <br /> is ...,. . <br /> v <br /> 5 <br /> S.S <br /> Phase I bond release for these parcels occurred as a result of the following bond release actions <br /> shown in Table 3. <br /> Table 3. Summary of Prior Phase I Bond Release for Parcels in SL19 Phase II Request <br /> Parcels Bond Release Permitting <br /> Action <br /> AB09, AB 12, FA 11, FA 12, ZA 12, KA 11 SL 14 <br /> AB13, KA13, ZA13 SL15 <br /> Phase II Bond Release <br /> Rule 3.03.1(2)(b) states: <br /> "Up to eighty-five percent of the applicable bond amount shall be released upon the <br /> establishment of vegetation supporting the approved post-mining land use and meeting the <br /> approved success standard for cover based on statistically valid data collected during a <br /> single year of the liability period." <br /> And, regarding Phase II bond release, Rule 3.03.1(3)(b) states: <br /> "No more than (60)percent of the bond shall be released so long as the lands to which the <br /> release would be applicable are contributing suspended solids to streamflow or runoff <br /> outside the permit area in excess of pre-mining levels as determined by baseline data or in <br /> excess of levels determined on adjacent non-mined areas." <br /> Regarding Phase II bond release, the approved reclamation plan calls for: <br /> o Specific topsoil replacement depth <br /> o Vegetative cover standard <br /> o Post-mining land use <br /> o Sedimentology estimates. <br /> The approved post-mining land use for the land applicable to SL19 is rangeland/wildlife habitat. <br /> The 376.1-acre bond release block, the subject of this bond release application (SL19), has been <br /> Permit Number C 19 81010 <br /> SL19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.