In April 2019, the primary power genset required a rebuild due to failure of one of the C27 <br /> engines. The other generator was also rebuilt at the same time. Permitted temporary power <br /> was brought onsite to relieve the primary power unit and allow the mine to continue to <br /> operate. The two C27s were ready for recommissioning in mid-July. Temporary power <br /> was decommissioned on July 14th and the rebuilt prime power genset was brought back <br /> online on July 171h. The rebuilt genset was installed outside Portal #4 and is depicted in <br /> Figure 113. <br /> 5 <br />