Laserfiche WebLink
ny. <br /> y <br /> f � <br /> y <br /> Figure 25. Panoramic photo of the fuel tanks adjacent to the generator Conex. The red <br /> tank is used to fuel heavy equipment while the white 12,000 gallon tank feeds the 100 <br /> gallon day tank within the generator Conex. While both tanks are double walled, none of <br /> the transfer points for either tank or the equipment in the generator Conex are in <br /> secondary containment. Photo captured October 23, 2019; view to the north and northeast. <br /> The liner was fully prepared and provided by Raven CLI Construction, Inc. Raven <br /> designed, managed and facilitated the installation of the liner (Figure 26 and 27). The fuel <br /> tanks are installed at an elevation —2 feet lower in elevation than the footprint of the <br /> genset Conex and are thus effectively —5 feet lower in elevation than the 100 gallon day <br /> tank within the Conex. Rapid Energy, Eaton, and Wagner (Caterpillar) will work together <br /> to successfully reinstall the generators and get them back on line. The liner installation <br /> will also be critically inspected by HRL to provide third party quality control on <br /> secondary containment. <br /> 38 <br />