My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-05_HYDROLOGY - M1999058 (4)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999058
>
2019-12-05_HYDROLOGY - M1999058 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 7:41:43 AM
Creation date
12/6/2019 7:46:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999058
IBM Index Class Name
Hydrology
Doc Date
12/5/2019
Doc Name
Oct. 11, 2019 Spill Report
From
Colorado Stone Quarries, Inc.
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
plans were created: one under the direction of Clean Harbors, Inc. and a second plan that <br /> was created by CSQ, GLA and HRL. <br /> On Thursday, October 171", a plan was suggested by Clean Harbors and was developed <br /> among CSQ, GLA, and Clean Harbors representatives. The primary goal of mitigation <br /> efforts was to prevent diesel laden waters from entering and impacting Yule Creek. The <br /> general plan commonly used by Clean Harbors to clean-up diesel spills within large <br /> volumes of fill is to flush the fill with clean water followed by insertion of Simple Green. <br /> Simple Green is a biodegradable, non-toxic EPA-approved (2013) surface washing agent. <br /> Following Simple Green application, more clean water is flushed into the system. Once <br /> flushing is complete, Micro-Blaze would be introduced to the flush input site as well as <br /> across the surface of the spill area. <br /> Clean Harbors suggested flushing clean water in at a volume 3x the spill volume with a Ix <br /> volume of diluted Simple Green. Therefore, the plan for this spill event included <br /> introduction of 5,000 gallons of clean water, followed by 5,000 gallons of diluted Simple <br /> Green, followed by 10,000 gallons of clean water. Micro-Blaze was to be applied at the <br /> diluted rate suggested by the manufacturer to appropriately accommodate a 5,000 gallon <br /> diesel spill. This plan was approved by the DRMS and corroborated by HRL as the <br /> appropriate initial response. <br /> On Tuesday, October 29, 5,000 gallons of clean water was pumped from Yule Creek up <br /> gradient of the spill location and was flushed into the hole pre-dug at the spill location <br /> near the generator Conex. As detailed above, the return of water into the sump was much <br /> greater than anticipated; therefore, the plan to introduce Simple Green and 10,000 <br /> additional gallons of water was abandoned. This change in plan was determined by: <br /> - >90,000 gallons water that flowed through the fill into the sump effectively diluted <br /> the diesel spill beyond the need for Simple Green. <br /> - Following consultation with HRL, it was learned that Simple Green had the strong <br /> potential to behave effervescently and potentially flood Yule Creek with bubbles. <br /> - 5,000 gallons of diesel in the road fill was flushed with >90,000 gallons of water <br /> resulting in an at least 18x dilution of the spilled diesel. <br /> - The source of the additional water was due to the precipitation that occurred during <br /> the mitigation process. <br /> Furthermore, the high return of water into the sump switched the plan from a mitigation <br /> plan to another emergency response plan centered on maintaining an appropriate sump <br /> level to not allow for surface flow of diesel-laden water into Yule Creek. <br /> Following the order to stop pumping very late in the evening on October 29, 2019. CSQ, <br /> GLA, and HRL representatives began developing a short term plan as well as a long-term <br /> sampling and remediation plans. The post-pumping short term plan involved removal of <br /> pumps, fortifying the northern edge of the sump, temporary filling of the sump, planned <br /> sample locations for monitoring wells, and removal of diesel-laden soils around the <br /> generator and the sump. The intent of the plan was to further prevent migration of diesel, <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.