Laserfiche WebLink
page 1 of 8 <br /> 6.4.12. Exhibit L — Reclamation Costs <br /> As described above in6.4.4 Exhibit D Mining Plan, the permittee has chosen to <br /> take a phased approach to surety bonding of reclamation costs. <br /> To begin, a surety bond will be posted for Phase I which is defined as <br /> reclamation of Cell 1 as shown in Exhibit F - Sheets 1, 2, 3 and 4 as well as <br /> revegetation of Cell 6 (plant area) and the east conveyor disturbance area. <br /> Before any disturbances occur outside of Phase I, additional surety will be posted <br /> for Phase II which includes reclamation of Cell 2 as shown in Exhibit F - Sheets <br /> 1, 2, 3, 5,6 and 7. Before any disturbances occur outside of Phase II, additional <br /> surety will be posted for Phase III which includes reclamation of Cells 3, 4, 5 and <br /> 6 as shown in Exhibit F Sheets 1, 2, 3 and 8-11. The following cost worksheets <br /> have been separated out by phase. It should be noted that reclamation earthwork <br /> volumes have been calculated utilizing Autodesk Civil 3D to model grading <br /> surfaces which are compared with mining excavation surfaces to yield accurate <br /> volumes of compacted clay liner volumes. Prior to posting surety bonding for <br /> each phase, the permittee may choose to revise what each phase will cover by <br /> submittal of a technical revision (TR). <br /> Amen Aggregate Resource <br /> Specific Exhibits <br />