Laserfiche WebLink
need to be imported? <br /> The grading plans shown in Exhibit F Sheets 1-11 are based on balanced earthwork for onsite materials only. The <br /> balancing was determined by utilizing Autodesk Civil 3D computer software to model stratigraphy based on drilling data. <br /> Therefore, no offsite materials will be required. Page 11 of Exhibit E Reclamation Plan has been updated to include <br /> methods used to balance the earthwork. <br /> Additionally, based on notes from our telephone conversation on 12/3/2019, 1 have updated the following: <br /> o Page 7 of Exhibit D Mining Plan has been updated to include clarification on how concurrent reclamation <br /> will occur to achieve the backfilled areas as mining proceeds and which eliminates the need to bond for <br /> backfilling the areas specified. <br /> o Page 11 of Exhibit E Reclamation Plan has been updated to include burial of the removed conveyor support <br /> concrete piers. <br /> o Page 12 of Exhibit E Reclamation Plan has been updated to include a statement that the compacted clay <br /> liner will occupy the entire space between the mining highwall and the final 3:1 slope. <br /> o Page 9 of Exhibit D Mining Plan has been updated to include clarification and definition of the proposed <br /> phases of mining as related to bonding and reclamation. <br /> o Exhibit L has been revised to include a description of the proposed phasing as well as costs have been <br /> separated out for each phase in the worksheets. <br /> Peter Wayland <br /> Weiland, Inc <br /> 303.518.2182 m <br /> 6 attachments <br /> ;j Page 9-10 Exhibit D.pdf <br /> 94K <br /> +w Page 11 Exhibit E.pdf <br /> 94K <br /> -im) Exhibit L.pdf <br /> 940K <br />