My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-04_PERMIT FILE - M2019025
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019025
>
2019-12-04_PERMIT FILE - M2019025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 3:24:43 PM
Creation date
12/5/2019 3:30:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019025
IBM Index Class Name
PERMIT FILE
Doc Date
12/4/2019
Doc Name
Adequacy Review Response #3
From
Weiland
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
need to be imported? <br /> The grading plans shown in Exhibit F Sheets 1-11 are based on balanced earthwork for onsite materials only. The <br /> balancing was determined by utilizing Autodesk Civil 3D computer software to model stratigraphy based on drilling data. <br /> Therefore, no offsite materials will be required. Page 11 of Exhibit E Reclamation Plan has been updated to include <br /> methods used to balance the earthwork. <br /> Additionally, based on notes from our telephone conversation on 12/3/2019, 1 have updated the following: <br /> o Page 7 of Exhibit D Mining Plan has been updated to include clarification on how concurrent reclamation <br /> will occur to achieve the backfilled areas as mining proceeds and which eliminates the need to bond for <br /> backfilling the areas specified. <br /> o Page 11 of Exhibit E Reclamation Plan has been updated to include burial of the removed conveyor support <br /> concrete piers. <br /> o Page 12 of Exhibit E Reclamation Plan has been updated to include a statement that the compacted clay <br /> liner will occupy the entire space between the mining highwall and the final 3:1 slope. <br /> o Page 9 of Exhibit D Mining Plan has been updated to include clarification and definition of the proposed <br /> phases of mining as related to bonding and reclamation. <br /> o Exhibit L has been revised to include a description of the proposed phasing as well as costs have been <br /> separated out for each phase in the worksheets. <br /> Peter Wayland <br /> Weiland, Inc <br /> 303.518.2182 m <br /> 6 attachments <br /> ;j Page 9-10 Exhibit D.pdf <br /> 94K <br /> +w Page 11 Exhibit E.pdf <br /> 94K <br /> -im) Exhibit L.pdf <br /> 940K <br />
The URL can be used to link to this page
Your browser does not support the video tag.