My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-04_PERMIT FILE - M2019045
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019045
>
2019-12-04_PERMIT FILE - M2019045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 3:24:03 PM
Creation date
12/4/2019 3:58:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019045
IBM Index Class Name
Permit File
Doc Date
12/4/2019
Doc Name
Application
From
James Thomas
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C-Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: i and completion: <br /> 2) How many years is the mine anticipated to be operational: , -�" years <br /> 3) Will mining activities oc r all-yearlong or just seasonally when weather its(check one)- <br /> ([])all-yearlong or seasonally,explain: l"l�S) <br /> 4) How many aces of the mine site will be disturbed at any given time: CC? acres <br /> 5) I) t of topsoil to be salvaged(only for surface disturbances) (check one): <br /> 4-6 inches =6-8 inches <br /> F-1_8-10 inches =10-12 inches <br /> =Other: <br /> N/A, explain: <br /> 6) Will you need to move any overburden (check one): ( Yes or(_[]j No U P TO k D 12 <br /> a. If yes,approximately how thick is the overburden? \�MLN\ZS feet <br /> 7) How will the mine be accessed: (existing roads CD new roads will be created <br /> Please describe the existing roads: <br /> -yam \� ! c� ��C_i� Locc-' <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> 8) Will water be needed during the mining operation(check one): (J:])Yes or(ZNo <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): (-D)Yes or No <br /> a. If yes,please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process(check one): (-ED)Yes or( No <br /> a. If yes, please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.