Laserfiche WebLink
e <br /> MONITORING WELL ZNSTALL&TION SHEET <br /> 1030 - 001 CLIENT Cotter CorOgratiM <br /> :TER NO. P- W - 2 DRILLING CONTRACTOR: Custom Awer Drilling, <br /> }N: <br /> Schwartzwalder Mine FIELD ENGINEER Z Vladimir Straskraba <br /> F INSTALLATION: 11 - 12 - 81 DRILLING SYSTEM: Auer <br /> Amer � .4ri <br /> DEPTH• DRILLING TOOLS : <br /> u <br /> ETER TYPE: �� well PIPE MATERIAL; PVC O.D.�h'� f.D.2 <br /> 20' <br /> LENGTH OF.SECTIONS: <br /> OF. H£ PIPE' COP: 65$4'.3 .�- <br /> .,r.. J¢INING METHOD: PUC-CemMt <br /> ;ION OF THE TIP: ` <br /> PERFORATION HYPE: .drilled <br /> rION :OF -THE GROUND 'SURFACE: <br /> SIZE -OF SLOTS" .&I%4 NO.OF SLOTS•.24/ <br /> LEVEL AT COMPLETION: 100' PERFORATED AREA: <br /> DEPTH (FT.): . <br /> ELEVATION (FT.): <br /> NON PERFORATED PIPES: FROM: +..-_13.4 TO: Z -4! <br /> NG OF THE HOLE: 10 minutes with clean PERFORATED PIPES: FROM: 8A To. 13.4' <br /> water <br /> GRAVEL PACK: FROM; 5 TOt 20' <br /> :TIOK STEEL CASING: TYPE AND DEPTH OF SEALING: <br /> 0. D., 2' of Bmtonite pellets @ 5' rr <br /> FROM: <br /> 7O: <br /> GEO-HYDRO Consulting, lrr:. <br />