Laserfiche WebLink
1 <br /> 0 <br /> r <br /> MONITORING WELL INSTALLATION SHEET <br /> 1030-001 CC= CORPORATION <br /> ]. CLIENT <br /> ETER NO. P- d-1 DRILLING CONTRACTOR: CUStOM Auger Drilling__ <br /> Schwartzwalder Mine 'Vladimir Straskraba and <br /> �iON: FIELD ENGINEER : <br /> • Mat MEMO <br /> OF INSTALLATION: 11-12-81 DRILLING SYSTEM:- -AMSUZ <br /> DEPTH: 25.5 . DRILLING TOOLS <br /> Auger - 4" • <br /> METER TYPE: Open Well PIPE MATERIAL: PVC Q.D. Sch• a.D.` i�' <br /> LENGTH OF.SECTIONS : <br /> = OF Yt�E PIPE TPv <br /> OPi 6592.9 <br /> t_ -- JOINING METHOD: C-CetilPlll: <br /> ;TIGN OF THE TIP: <br /> drilled <br /> PERFORATION TYPE:' <br /> &TIOK OF THE.GROUND SURFACE:•65(W•4 <br /> SIZE OF SLOTS: ; NO. OF SLOTS: <br /> R LEVEL AT COMPLETION: PERFORATED AREA: <br /> DEPTH (FT.): <br /> ELEVATION (FT.): _ <br /> NON PERFORATED PIPES: FROM: + 2'5 TO: 17'0 <br /> ZZ-0 <br /> Clean water for <br /> 22.0 <br /> IING OF THE HOLE: PERFORATED PIPES: FROM:-TO: <br /> TQ: <br /> t1lites . <br /> GRAVEL PACK: FROM: _TO; <br /> :CTION STEEL CASING: TYPE AND DEPTH OF SCALING:BMtOnite Pellets <br /> 0. D.: at ton <br /> r FROM: - <br /> TO' <br /> GEO-HYDRO Consulting, Inc, <br />