Laserfiche WebLink
TRAPPER MINING INC. <br /> P.O.Box 187 Craig,Colorado 81626 (970)824-4401 <br /> November 25,2019 <br /> WEIVED <br /> Ms. Robin ReilleyZa19 <br /> Environmental Protection Specialist N0 �2 7 ti <br /> Colorado Division of Reclamation,Mining and Safety CiVISIQN pi=flEGIAMA110N,,,.8 <br /> 1313 Sherman Street,Room 215 `y� `� lY <br /> Denver, CO 80203 M1ry <br /> Re: Trapper Mining Inc., Permit No. C-1981-010 <br /> Permit Revision PR-09,Mine Plan Update <br /> Dear Ms. Reilley: <br /> Enclosed are two copies of a mine plan update to our PR-09 application.The enclosed material includes <br /> text,tables and maps that present the proposed changes. Significant proposed changes include: <br /> • N Pit going from a dipline orientation to a strikeline orientation,with associated changes to <br /> highwall mining orientations; <br /> • L Pit annual mining and reclamation sequencing and post-mining topography(PMT)updates as a <br /> result of future reductions in contracted coal to Craig Station; <br /> • PMT update to the ash pit based on increased ash placement and reduced N Pit spoil placement; <br /> • Creation of a temporary out-of-pit spoil dump necessary for final N Pit backfill; <br /> • A revised D/E Pit final PMT based on projected future reductions in coal ash placement as a <br /> result of known and probable future Craig Station unit closures; <br /> • Haulroad construction update for N Pit. <br /> A revised bond section will be presented after you have had a chance to review the updated mine plan. <br /> The new bond section will be submitted before the end of December. <br /> The following revised permit text pages are enclosed and updated as follows: <br /> • 3-15.Updated to note all of F Pit now reclaimed. <br /> • 3-15a.N Pit updated from dipline to strikeline; highwall mining orientation changed from west to <br /> north-south. <br /> • 3-15b. Eliminated discussion of N Pit from being evaluated for mining to will be mined. <br /> • 3-15c.N Pit paragraph added to Reclamation Plan section. <br /> • 3-40.Removed D/E Pit exception to the PMT discussion. <br /> • 3-40b. Changed narrative back to quarterly Horse Gulch Fill inspection; removed 2018 as final <br /> reclamation date. <br /> 0 3-44.Updated N Strike Pit boxcut discussion. <br />