Laserfiche WebLink
RECEIVED <br /> NOV 2 z 2 in <br /> J <br /> TRAPPER MINING INC. <br /> CRAIG, COLORADO DIVISION OF RECLAMATION <br /> RiIININGAW. S11FFTY <br /> HORSE GULCH FILL <br /> QUARTERLY FILL CERTIFICATION <br /> I, Tonia Marie Perkins, a Licensed Professional Engineer in the State of Colorado, in <br /> accordance with 2CCR407-2, Section 4.09.1(11), have conducted a quarterly inspection of the <br /> Horse Gulch Fill construction. This quarterly inspection was conducted on November 19, 2019. <br /> The fill was inspected for stability, and no appearance of instability, structural weakness, or <br /> other hazardous condition was observed during the inspection. Construction during this quarter <br /> has been under my supervision, and to the best of my knowledge and belief, has been <br /> consistent with the design approved by the Colorado Division of Reclamation, Mining, and <br /> Safety. <br /> \a��a�uinuuuun,,� <br /> 0 LPRIE <br /> ° 43864cc <br /> Tonia Marie Perkins0�;•• : &A, <br /> CO PE 43864 <br /> Dat <br />