Laserfiche WebLink
S-62 <br /> EXHIBIT S-1 <br /> CTL THOMPSON,INC.GEOTECHNICAL ENGINEERING EVALUATION FOR OIL&GAS <br /> WELL HEADS,WATER WELLS,AND OIL,GAS AND WATER PIPELINES <br /> (a)Provide a notarized agreement between the Applicant and the Person(s)having an interest in the <br /> structure,that the Applicant is to provide compensation for any damage to the structure,or <br /> (b) where such an agreement cannot be reached,the applicant shall provide an appropriate <br /> engineering evaluation that demonstrates that such structure shall not be damaged by activities <br /> occurring at the mining operation <br /> Although contacts have been established and conversations have taken place with structure entities, a <br /> Structure Agreement could not be reached for the following person(s)having an interest in the structures <br /> listed below.Due to the inability to provide a notarized agreement between the applicant and person(s) <br /> having an interest in the structure an Engineering Evaluation provided by CTL Thompson,Inc.has been <br /> provided in lieu of a structure agreement per Rule 6.4.19(b)Exhibit S—Permanent Mad-made Structures. <br /> The Engineering Evaluation was stamped by a Colorado licensed Professional Engineer on November 20, <br /> 2019. <br /> SEMGROUP: <br /> - Oil Pipelines <br /> *See Exhibit S-2: SEMGROUP Structures <br /> Molson Coors Brewing Company—Industrial Gas Services,Inc.: <br /> - Natural Gas Pipelines <br /> *See Exhibit S-3: Molson Coors Brewing Company/industrial Gas Services,Inc.Structures <br /> Magellan Pipeline Company,L.P.: <br /> - Oil Pipeline <br /> *See Exhibit S-4: Magellan Pipeline Company,L.P.Structures <br /> Williams—Rocky Mountain Midstream—ONEOK: <br /> - Natural Gas Liquids Pipeline <br /> - Natural Gas Pipeline <br /> *See Exhibit S-5:Williams/Rocky Mountain Midstream—ONEOK Structures <br /> Keenesburg No. 2 Mine—Reclamation Operation—November 22, 2019 <br />