Laserfiche WebLink
TABLE L-1 L,-7 <br /> RECLAMATION COST ESTIMATE-CSC KEENESBURG NO. 2 MINE PROJECT <br /> D Post-Closure Year 4(PC-4) 437 1 Acres 75.001 $32,775 <br /> E Post-Closure Year 5(PC-5) 305 1Acres 150.001 $15,250 <br /> Sub-Total Monitoring and Maintenance-5 Years $335,800 <br /> I I I I <br /> TOTAL DIRECT COST(Items 1-3) $3,310,994 <br /> INDIRECT COSTS <br /> 4 Liability Insurance 2%of Direct $66,220 <br /> 5 Performance Bond 1.05%of Direct $34,765 <br /> 6 Job Superintendent 6 Month $8,750 $52,500 <br /> 7 Profit 10%of Direct $331,099 <br /> 8 Engineering/Bid Preparation 4.25%of Direct $140,717 <br /> 9 Reclamation Management/Administration 5%of Direct 165 550 <br /> TOTAL INDIRECT COSTS(Items 4-9) $799,647 <br /> GRAND TOTAL $4,101,845 <br /> Notes: 'Estimate Provided by Superior Industries,Inc.(Plant Constructor)-Includes Labor and Materials For Complete Plant/Equipment Demolition/Removal <br /> Z Represents Year 13 Mine Block at Average Area of 132 Acres as Maximum Terminal Pit Exposure <br /> 3 Represents Final Closure and Reclamation Cost at Maximum"Affected Area"-Concurrent Reclamation During Life-of-Mine+Full Build-Out Waste Stockpile+Remaining Haul Roads <br /> Keenesburg No. 2 Mine_112 Reclamation Operation—November 22, 2019 <br />