Laserfiche WebLink
20 November 2019 C-1981-010/Trapper Mine RAR <br /> TOPSOIL—RULE 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4 <br /> o No instability was noted on the observed topsoil piles and the piles appeared to be marked <br /> appropriately. <br /> o No riling or gullying at topsoil piles was apparent at the time of inspection. <br /> USE of EXPLOSIVES—Rule 4.08 <br /> General Requirements 4.08.1;Pre blasting survey 4.08.2;Public Notice of Blasting Schedule 4.08.3; <br /> Surface Blasting Requirements 4.08.4;Records of Blasting for Surface Coal Mining 4.08.5. <br /> Seismographic Measurements 4.08.6 <br /> A blast in L dip pit was observed. All notifications were audible and the shot appeared to have been well <br /> executed and planned. <br /> BA CKFILL and GRADING—R ULE 4.14 <br /> o Backfilling and grading operations have been completed for the field season and progressed as <br /> permitted. <br /> REVEGETATION-Rule 4.15 <br /> General Requirements 4.15.1; Use of Species 4.15.2, Grazing 4.15.5 <br /> o Contemporaneous reclamation and revegetation activities progressed adequately over the course <br /> of the year. No extensive areas devoid of vegetation or weed infestations were apparent at the <br /> time of inspection. <br /> DOCUMENTS RECEIVED <br /> None <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Partial Inspections this Fiscal Year: 2 <br /> Page 6 of 6 <br />