My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-22_GENERAL DOCUMENTS - C1983059
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1983059
>
2019-11-22_GENERAL DOCUMENTS - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 2:59:24 PM
Creation date
12/2/2019 9:51:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
General Documents
Doc Date
11/22/2019
Doc Name Note
For PR1
From
DRMS
To
Oxbow Mining, LLC
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task# 18A Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: DELTA <br /> Total one-way travel distance: 40.00 miles <br /> Average Travel Speed: 40.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $5,815.18 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $151.04 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 1.00 1.00 <br /> Return Time(Hours): 1.00 1.00 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 3.00 2.00 <br /> JOB TIME AND COST <br /> Total job time: 6.00 Hours <br /> Totaljob cost: $5,966 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.