My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-22_GENERAL DOCUMENTS - C1983059
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1983059
>
2019-11-22_GENERAL DOCUMENTS - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 2:59:24 PM
Creation date
12/2/2019 9:51:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
General Documents
Doc Date
11/22/2019
Doc Name Note
For PR1
From
DRMS
To
Oxbow Mining, LLC
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task#TTT Page 3 of 5 <br /> 200 ft.push <br /> Secondary Screener 36'x9'xl4' Bldg.(MN)demo./on- 4,536.00 CF $0.23 $1,035.12 <br /> site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> -Pad 40'xl4'x8" Demo.and on-site 560.00 SF $1.25 $697.31 <br /> disposal in excavated <br /> pit,8 in.thick-Max. <br /> 200 ft.push <br /> Secondary Stacker to 110'x3'x30' Bldg.(MN)demo./on- 9,900.00 CF $0.23 $2,259.18 <br /> Reclaim site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> -Footing 1.5'x3'x50 LF Demo.and on-site 50.00 LF $8.40 $420.25 <br /> disposal in excavated <br /> pit, 1.5 ft.x 3 ft.-Max. <br /> 200 ft.push <br /> Secondary Stacker to 100'x3'x10' Bldg.(MN)demo./on- 3,000.00 CF $0.23 $684.60 <br /> Pile site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> -Footing 1.5'x3'x50 LF Demo.and on-site 50.00 LF $8.40 $420.25 <br /> disposal in excavated <br /> pit, 1.5 ft.x 3 ft.-Max. <br /> 200 ft.push <br /> Primary Stacker to 100'x3'x10' Bldg.(MN)demo./on- 3,000.00 CF $0.23 $684.60 <br /> Lump Pile site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> -Footing 1.5'x3'x50 LF Demo.and on-site 50.00 LF $8.40 $420.25 <br /> disposal in excavated <br /> pit, 1.5 ft.x 3 ft.-Max. <br /> 200 ft.push <br /> Truck Dump 24'xl8'xl4' Bldg.(MN)demo./on- 6,048.00 CF $0.23 $1,380.15 <br /> site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> CMP#2 12"x25 LF Pipe,corrugated metal 25.00 LF $3.38 $84.56 <br /> (CMP)- 12 in. <br /> diameter pipe <br /> CMP#3 and CMP#4 18"x95 LF Pipe,corrugated metal 95.00 LF $4.58 $435.26 <br /> (CMP)- 18 in. <br /> diameter pipe <br /> Principle Spillway at 12"x80 LF Pipe,corrugated metal 80.00 LF $3.38 $270.59 <br /> Sediment Pond (CMP)- 12 in. <br /> diameter pipe <br /> Truck Dump to 180 LF Conveyor,Horizontal 3.00 EA $2,900.00 $8,700.00 <br /> Primary Conveyor Belt 24"Belt,61.5' <br /> Length <br /> Primary to Secondary 80 LF Conveyor,Horizontal 2.00 EA $2,175.00 $4,350.00 <br /> Conveyor Belt 24"Belt,41.5' <br /> Length <br /> Primary to Transfer 100 LF Conveyor,Horizontal 2.00 EA $2,900.00 $5,800.00 <br /> Conveyor Belt 24"Belt,61.5' <br /> Length <br /> Crusher to Secondary 80 LF Conveyor,Horizontal 2.00 EA $2,175.00 $4,350.00 <br /> Conveyor Belt 24"Belt,41.5' <br /> Length <br /> Secondary to 46 LF Conveyor,Horizontal 1.00 EA $2,900.00 $2,900.00 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.