My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-22_GENERAL DOCUMENTS - C1983059
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1983059
>
2019-11-22_GENERAL DOCUMENTS - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 2:59:24 PM
Creation date
12/2/2019 9:51:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
General Documents
Doc Date
11/22/2019
Doc Name Note
For PR1
From
DRMS
To
Oxbow Mining, LLC
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or placed in an appropriate stockpile for later loading. Product coal includes lump, stoker, and <br /> fines. Limited coal crushing is performed at the loadout. Crushing, conveying and loadout <br /> operations are equipped with a water spray system to control dust. <br /> Prior to the approval of this PR-01, the reclamation plan specified the demolition and disposal of <br /> some facilities, grading to restore the site to the approximate original contour, topsoil <br /> replacement, and seeding with adapted pasture grasses. The site was to be reclaimed to a post- <br /> mining land use of irrigated hay "Cropland". Details of the previously approved plan have been <br /> retained in section 2.05.4 of the PAP for future reference. <br /> With the approval of this PR-01, the Division has approved a change in the post-mining land use <br /> to "Industrial or Commercial". The currently approved reclamation plan is described in section <br /> 2.05.5 of the PAP. The reclamation plan specifies that the facility pads will remain in the pads <br /> current configurations, which reflect the configurations during the active life of the loadout. <br /> Concrete walls and footers will be demolished and Loadout tunnels will be filled. The approved <br /> post-mining topography is shown on Map 10 of the PAP, which was revised with this PR-01. <br /> Map 10 and section 2.05.5 both refer to Maps 12 and 13 of the PAP, which identify topographic <br /> sections. Maps 12 and 13 of the PAP were not revised with this PR-01, however the text of <br /> section 2.05.5 and in the legend of Map 10 of the PAP clearly states that the "Present <br /> Configuration" shown in the topographic section drawings now represents the revised post- <br /> mining configuration. <br /> Facilities to remain after reclamation include the office, garage, wooden building adjacent to the <br /> office, the paved haul road and all of the gravel access road. The siding track may remain if it is <br /> sold to the Union Pacific Railroad. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.