Laserfiche WebLink
E-12 <br /> seedbed will be either raked or harrowed to further ensure seed retention. Both types of locations will <br /> be subject to crimping/mulching immediately thereafter. <br /> Mulching: CSC will employ straw crimping in conjunction with seed application, utilizing two (2) <br /> tons per acre of certified weed free straw,over the entirety of the site. Crimping will be accomplished <br /> via discing. As earlier noted,no fertilizer application is proposed,and all areas will be subject to natural <br /> revegetation processes(i.e.,there will be no irrigation). <br /> TABLE E-2 <br /> SEED MIXTURE AND APPLICATION RATE <br /> Species Lbs.PLS/Acre* <br /> Sand Bluestem(Champ; Chet) 1.00 <br /> Sand Lovegrass(Bend;Native;Ne27) 2.50 <br /> Indian Ricegrass(Nezpar;Rimrock) 3.00 <br /> Prairie Sandreed(Goshen) 0.75 <br /> Green Needlegrass(Lodorm) 1.50 <br /> Little Bluestem(Blaze; Cimarron; Camper) 0.75 <br /> Yellow Indiangrass(Cheyenne;Holt; Scout) 0.50 <br /> Switchgrass (Blackwell;Nebraska 28) 1.50 <br /> Sand Dropseed 0.50 <br /> Total: 12.00 <br /> *Lbs.PLS/Acre=Pounds of Pure Live Seed per Acre <br /> (e) A plan or schedule indicating how and when reclamation will be implemented Such plan or <br /> schedule shall not be tied to any specific date but shall be tied to implementation or completion of <br /> different stages of the mining operation as described in Sub-section 6.4.4(1)(e). The plan or schedule <br /> shall include: (i) an estimate of the periods of time which will be required for the various stages or <br /> phases or reclamation;(ii)a description of the size and location of each area to be reclaimed during <br /> each phase,and, (W)an outline of the sequence in which each stage or phase of reclamation will be <br /> carried out. []Vote: The schedule need not be separate and distinct from the Reclamation Plan, but <br /> may be incorporated therein] <br /> Keenesburg No. 2 Mine_112 Reclamation Operation—November 22, 2019 <br />