Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Permit Revision 1-Change of post-mining land use <br /> Site: Terror Creek Loadout Permit Action: PR Permit/Job#: C1983059 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 11/22/2019 County: Delta Filename: C059-000 <br /> User: LDS <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> OlA Remove Coal Material from Disturbed Area DOZER 1 15.45 $4,150 <br /> 03A Move Sediment Storage Pile for On-Site Disposal DOZER 1 3.98 $1,068 <br /> 05A Compact Coal Material in On-Site Disposal Area COMPACT 1 9.45 $1,456 <br /> 12A Plug and Seal 3 Alluvial Monitoring Wells BOREHOLE 1 8.00 $987 <br /> 15A Demolish and Remove All Structures DEMOLISH 1 200.00 $137,970 <br /> 18A Mobilize/Demobilize Equipment for Reclamation MOBILIZE 1 6.00 $5,966 <br /> SUBTOTALS: 242.88 $151,597 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $3,062 <br /> Performance bond: 1.05 Total= $1,592 <br /> Job superintendent: 104.00 Total= $7,217 <br /> Profit: 10.00 Total= $15,160 <br /> TOTAL O&P= $27,030 <br /> CONTRACT AMOUNT(direct+O&P)= $178,627 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 8.00 Total= $14,290 <br /> Reclamation management and/or administration: 5.81 $10,378 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $52,199 <br /> TOTAL BOND AMOUNT(direct+indirect)= $203,796 <br />