Laserfiche WebLink
REVISED <br /> RECLAMATION <br /> PLAN ; , <br /> ,,, ;�,�-,_ � =.--vim_ <br /> \ \ ' - -' .ten % ROUTT COUNTY <br /> � � � � � �� � �� � � PUBLIC WORKS <br /> NW 1 SECTION 12, T6N, R88W, 6TH PM, \\ - - ; - DEPARTMENT <br /> ' \ \ �� \ NEW MINING r'� <br /> \ \ \ \ - BOUNDARY <br /> 4 ROUTT COUNTY, COLORADO <br /> FUNK GRAVEL PIT -- ;; NEW MINING <br /> _ _ - BOUNDARY <br /> EXISTING ACCESS ROAD <br /> TO BE RECLAIMED BY \�� \ <br /> OTHERS. pk <br /> —snow _ <br /> 1 <br /> SEED AND MU CH ALL--_ <br /> I <br /> ' 4:1 LOP / / 1 \ \ \\ SLOPES AND [�ISTURBED- <br /> \ \: \� AR AS WITH APPYVED-, <br /> 100 50 0 100 200 \_ _; � �\ <br /> j,',' °*,!s. ,, NEW MINING z / l <br /> h( �:�� °i5 \R �..- ��` •,, �. \ \ \ \ = e�so \1I�/� BOUNDARY Q W v <br /> SCALE: 1"=100` ? a.=� , �� `` =\:. \ \ °'� / / � <br /> \ n <br /> SEED AND MULCH ALL O LL <br /> SLOPES AND <br /> SEED AND MULCH ALL --' '+�,.,^\,` \ \ \ ,. i ;�= \ / / // / // /� / DISTURBED AREAS WITH ` <br /> SLOPES AND %� -1\\ 1 l } v j, \ V / / Aso / / / / APPROVED SEED MIX QDISTURBED AREAS r <br /> APPROVED SEED MIX <br /> TM <br /> NOTES: Q <br /> EW MINING z <br /> PHASE 2 \ ` �1 J fi 1�!// / // i! / // , BOUNDARY <br /> T NEW MINING - 4:I,SLOPS <br /> HE MINING WILL ADVANCE TO THE SOUTH ABOUT 700' FROM THE ELEVATION OF 6450 ON THE SOUTHERN LIMITS OF PHASE 2. r /�/ ,/ <br /> THE FINAL GRADING WILL BE DONE WITH THE SLOPES RECLAIMED AT A RATIO OF 4:1 (HORIZONTAL:VERTICAL). THE OVERBURDEN BOUNDARY1� /// , / p/ LLJ <br /> STOCKPILE WILL BE USED TO ACCOMPLISH THIS. MOST OF PHASE 2 WILL NOT BE RECLAIMED BEFORE THE NEXT PHASE STARTS. I '.l q 11 E7 STIN \ // t y,,( g ', 4:1 SLOPE / l <br /> RECLAMATION OF ANY AREA NOT IN USE WILL BE DONE AS SOON AS POSSIBLE. THE SLOPES WILL BE CUT TO 2:1 I \ 1 t 1 * ,6 MINING FA lam/// / d` / v <br /> \. \e O/ <br /> (HORIZONTAL:VERTICAL) TO GENERATE AS MUCH GRAVEL AS POSSIBLE. THIS SLOPE WILL THEN BE FILLED WITH OVERBURDEN i \ \�\ <br /> MATERIAL TO BRING IT TO A 4:1 SLOPE WHEN MINING OPERATIONS ARE COMPLETED. THE BOTTOM OF THE PIT WILL HAVE A 1% I--- <br /> SLOPE AND DRAIN TO THE NORTH. <br /> TOPSOIL AND OVERBURDEN WILL BE STOCKPILED TO THE SOUTH IN AN AREA OF ABOUT 2.0 ACRES AND A DEPTH OF 10 FEET. <br /> THE TOPSOIL AND OVERBURDEN STOCKPILE WILL HAVE SLOPES THAT ARE FLAT ENOUGH TO ACCOMMODATE MOWING MACHINERY. <br /> THE TOPSOIL AND OVERBURDEN STOCKPILE WILL BE SEEDED AT THE END OF EACH YEARLY CONSTRUCTION DISTURBANCE TO II\ S ;. 1\( /////// / - SEED AND MULCH ALL <br /> PREVENT EROSION. HOWEVER, DURING THE FIRST YEAR OF OPERATION (PRESUMABLY 2020), THE SEEDING OF THE TOPSOIL AND --I-I\ SLOPES AND O <br /> OVERBURDEN STOCKPILE SHALL BE DELAYED UNTIL SPRING OF 2021, SPRAYING AGAINST NOXIOUS WEEDS WILL BE DONE IN 1_ /\ \ J / // / /� -- DISTURBED AREAS WITH <br /> ACCORDANCE WITH ROUTT COUNTY'S WEED SPRAYING PROGRAM. THE TOTAL DISTURBANCE IN PHASE 2 IS ESTIMATED TO BE SEED AND MULCH ALL / q// /f APPROVED SEED MIX <br /> ABOUT 6 ACRES. A PERIMETER DITCH WITH CHECK DAMS WILL BE USED TO INTERCEPT RUNOFF WATER. <br /> SLOPES AND DISTURBED I / \ f \ is <br /> % <br /> PHASE 3 / �.. r.: � i I. / 1 g <br /> AREAS WITH APPROVED I g / 1 1 E 4:1 SLOPE <br /> THE MINING WORK WILL BE DONE AT 2:1 SLOPES. AT THE COMPLETION OF MINING OF THIS PHASE, THE SLOPES TO THE EAST SEED MIX �\ l I 'a g & <br /> AND NORTH WILL BE SET AT 4:1 (HORIZONTAL:VERTICAL) WITH THE EXISTING OVERBURDEN. TOPSOIL WILL BE TAKEN FROM THE <br /> RESERVE PILE AT THE SOUTHEAST AREA OF THE SITE. THE SEED MIXTURE WILL BE OF NATIVE GRASSES AS SPECIFIED IN THE MIX \ V/ / = \ \ 1 <br /> DESIGN FROM THE SOIL CONSERVATION SERVICE. THE SLOPE OF THE FLOOR WILL BE AT ABOUT 1%AND WILL DRAIN TO THE WEST. I I/ / I I S L- \ \ \ I I <br /> THE TOTAL SURFACE DISTURBANCE IN PHASE 2 AND 3 IS ESTIMATED AT ABOUT 16.25 ACRES. <br /> NEW MINING $L,OIbE <br /> BOUNDARY l 1 \ I g <br /> GENERAL NOTE: <br /> STRAW BALES AND WATTLES <br /> AS A NOTE TO THE SUGGESTED RECLAMATION PLAN, ANY STRAW BALES OR WATTLES USED ANYWHERE IN THE PERMITTED AREA, 111 ! <br /> SHALL BE CERTIFIED WEED-FREE, INCLUDING JOINTED GOAT WEED. ( \ - \� , , \ <br /> \ / %' / \ \\ I l I I Date 08.26.19 <br /> AT THE COMPLETION OF MINING SLOPES ON THE WEST AND NORTH SIDE SHALL BE SET AT 4:1. THE FLOOR OF THE PIT SHALL BE \ .// / ., S ffi '' %/ / /'�','/� \l\, 11111 I/ BOUNDARY NEW MINING Drawn By MTM <br /> RECLAIMED AT A SLOPE OF M GENERALLY FALLING TO THE NORTH AND WEST. _ 1 / / / /� SEED AND,MULCH/ALL / \ \1\evas I I I I I I __ <br /> SLOPES A D/D1SYURBED Reviewed By <br /> SEED MIX ��JI ---- <br /> / / AREAS W('1F{' dR;bYED / o" ,/ \\\\ {I f I I I Job No. <br /> SEED MIX' File --- <br /> (FROM U.S.D.A, NATURAL RESOURCES CONSERVATION SERVICE, STEAMBOAT SPRINGS, CO) a / e�ee�—}euy sass 1�/ , <br /> SPECIES P.OF MIX PLS LBS./ACRE Scale <br /> SMOOTH BROMEGRASS MANCHAR 25 3.5 I h l /�) ; ,'/ SEED AND MULCH ALL <br /> PUBESCENT WHEATGRASS LUNA 50 7.0 I /; / - i// Revisions <br /> STREAMBANK SODAR 25 3.0 1 1 ;'/`j I I I / / - \ SLOPES AND DISTURBED <br /> `� AREAS WITH APPROVED <br /> THE ABOVE SEEDING RATES ARE BASED ON BROADCAST RATES. IF THE SITE IS DRILLED, THEN REDUCE THE ABOVE RATES BY \ ".\ l / / 1 j I :/ / :I. 1 SEED MIX <br /> ONE HALF. AFTER SEED IS BROADCAST, THE AREA SHOULD BE LIGHTLY HARROWED OR DUG OVER WITH A LOG CHAIN TO HELP \ ,\\� \`1 / g 1 I I SEED'AN0 M�1I.CW \ <br /> COVER SEED. AFTER HARROWING, THE SITE SHOULD BE FERTILIZED WITH A MINIMUM OF 40-10-5 AVAILABLE FERTILIZER MIX. X ' ; SLOf�H4l 'QI BF I <br /> AFTER FERTILIZING, THE SITE SHOULD BE COVERED WITH STRAW MULCH AT A RATE OF 2,500 LBS PER ACRE. AFTER THE STRAW \�`\1 III R 11d 'N `I I I <br /> IS SCATTERED EVENLY OVER THE SITE, THE STRAW SHOULD BE DISKED TO CRIMP IT INTO THE SOIL. THE MULCH WILL PROTECT \� 1 I I!I ,1�fX; <br /> THE SOIL FROM DRYING AND CRACKING, THUS GIVING THE GRASS SEEDLINGS A BETTER ENVIRONMENT TO GET ESTABLISHED IN. <br /> THE SEEDING OF THE SITE SHOULD BE DONE IN THE SPRING OR THE FALL OF THE YEAR. FOR THE FIRST GROWING SEASON A l <br /> I 1 \ SEED AND MULCH ALL <br /> HERBICIDE SHOULD BE USED TO CONTROL ANNUAL BROADLEAF WEEDS. A RECOMMENDED MIX IS 1/10 OZ OF ALLY MIXED WITH <br /> I I:,, sasu I 1 \ <br /> 1/3 LB OF 2,4—D. SPRAYING SHOULD BE DONE DURING THE FIRST WEEK OF DUNE. SLOPES AND DISTURBED Sheet\\ rj li sass eys \\�'-- AREAS WITH APPROVED <br /> SEED MIX <br /> ewa sWt e� <br /> NEW MINING 4:1 SLOPE --_-_ <br /> BOUNDARY Rp <br />