My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-22_REPORT - C1981010
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2019-11-22_REPORT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 2:36:44 PM
Creation date
11/22/2019 2:15:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
11/22/2019
Doc Name
Annual Waste Bank Certification
From
Trapper Mining Inc.
To
DRMS
Annual Report Year
2019
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 19, 2019 <br /> Horse Gulch Fill Quarterly Inspection Report <br /> Fourth Quarter 2019 <br /> Table of Contents <br /> 1.0 Introduction 2 <br /> 2.0 Critical Construction Periods 4 <br /> 2.1 Removal of All Organic Material and Topsoil 4 <br /> 2.2 Placement of Underdrainage Systems 4 <br /> 2.3 Installation of Surface Drainage Systems 4 <br /> 2.4 Placement and Compaction of Fill Materials 4 <br /> 2.5 Revegetation 6 <br /> 3.0 References 6 <br /> 1 certify that this report was prepared by me. <br /> •�,RIE <br /> a , <br /> 2• <br /> ° 43864 <br /> onia Marie Perkins ,FSS�•••••\'�� ��\\ <br /> CO PE 43864 oNia����a���� <br /> Mining Engineer <br /> Trapper Mining, Inc. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.