Laserfiche WebLink
November 19, 2019 <br /> Horse Gulch Fill Quarterly Inspection Report <br /> Fourth Quarter 2019 <br /> Table of Contents <br /> 1.0 Introduction 2 <br /> 2.0 Critical Construction Periods 4 <br /> 2.1 Removal of All Organic Material and Topsoil 4 <br /> 2.2 Placement of Underdrainage Systems 4 <br /> 2.3 Installation of Surface Drainage Systems 4 <br /> 2.4 Placement and Compaction of Fill Materials 4 <br /> 2.5 Revegetation 6 <br /> 3.0 References 6 <br /> 1 certify that this report was prepared by me. <br /> •�,RIE <br /> a , <br /> 2• <br /> ° 43864 <br /> onia Marie Perkins ,FSS�•••••\'�� ��\\ <br /> CO PE 43864 oNia����a���� <br /> Mining Engineer <br /> Trapper Mining, Inc. <br /> 1 <br />