My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-21_REVISION - M2004044 (45)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004044
>
2019-11-21_REVISION - M2004044 (45)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 7:05:27 AM
Creation date
11/22/2019 9:51:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004044
IBM Index Class Name
Revision
Doc Date
11/21/2019
Doc Name
Final Complied Application Material -Part 3 of 4
From
Aggregate Industries - WCR, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
ERR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unit <br /> Reclamation Operation Quantity Units Cost $ Cost($) <br /> Active Mining Area(South Cell and remaining <br /> disturbance East Cell <br /> 1 Backfill remaining East Cell mining face and side 93,150 CY $3.50 $326,025 <br /> slopes to 3HAV(2,300'X(27'X 81'X 0.5) <br /> 2 Rough grade disturbed areas in East cell(85'x 7,240 CY $0.50 $3,620 <br /> 2,300 x 1 ) <br /> 3 Replace topsoil on backfilled mining cell area 49,610 CY $1.05 $52,091 <br /> above the HWL of the reservoir(61.5 acres x 0.5') <br /> Final grade East cell 5,100 CY $0.50 $2,550 <br /> 4 (85'x 2,300'x 0.5')+(800'x 100'x 0.5') <br /> 5 Backfill South Cell 700,000 Tons $2.50 $1,750,000 <br /> 6 Replace Topsoil South Cell 11,858 CY $1.05 $12,451 <br /> Miscellaneous Disturbed Areas(Stockpiles, Haul <br /> Roads, Conveyor route <br /> 1 Replace topsoil on internal haul roads and main 2,420 CY $1.05 $2,541 <br /> site entrance(3 acres x 0.5') <br /> 2 Replace topsoil on conveyor route 2,662 CY $1.05 $2,795 <br /> (3.3 acres X.5') <br /> 3 Replace topsoil on stockpile area 4,033 CY $1.05 $4,235 <br /> (5 acres x 0.5') <br /> 4 Scarify internal haul roads and conveyor route 8.3 Acre $500 $4,150 <br /> areas <br /> 5 <br /> Final grade all miscellaneous areas(8.3 acres x 6,695 CY $0.50 $3,348 <br /> 0.5') <br /> Final Reclamation <br /> Disturbed 1 Seed backfilled South Cell 15 Ac $675 $ 10,125 <br /> Acreage <br /> 2 Seed all areas in East Cell above the HWL of 73 Ac $675 $49,275 <br /> the reservoir <br /> 3 Re-seed 20%of all areas in <br /> Area of disturbance above the HWL of the 15 Ac $675 $10,125 <br /> reservoir <br /> Total Reclamation Costs $2,233,330 <br /> Contractor Mobilization/Demobilization Costs(8%) 0.08 $178,666 <br /> Overhead (18.5%) 0.185 $413,166 <br /> Administration (5%) 0.05 $111,666 <br /> Total Proposed Financial Warranty $2,936,828 <br /> Disturbed Acreage 103 <br /> Financial Warranty per Acre $28,513 <br /> Aggregate Industries Tucson South Resource <br /> Permit#M-2004-044 112 Permit Amendment <br /> Page L-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.