Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Soil profiles vary from zero to several feet. The disturbance of the topsoil by soil <br /> sampling activity has minimal impact. Holes created y the soil auger average 1 foot <br /> dip and 2 inches in diameter. The auger holes are refilled with the same material that <br /> came from the hole after the sample is taken so reclamation is immediate. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> NA <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> NA, however a new chain and lock have been installed on the Allard adit to address <br /> ongoing safety concerns. <br /> Form 2—Public File Page 9 of 14 <br />