My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-20_REVISION - M1977560
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977560
>
2019-11-20_REVISION - M1977560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 2:30:40 PM
Creation date
11/21/2019 2:36:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977560
IBM Index Class Name
Revision
Doc Date
11/20/2019
Doc Name
Decision Date Extension Request
From
Valco
To
DRMS
Type & Sequence
SI4
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Valco Aggregate Mine Reclamation 2019 <br /> ' ! Habitat Construction, LLC <br /> PO Box 550/200 S 17th Street <br /> Rocky Ford,CO 81067 <br /> Contact: Randall Kurtz <br /> Phone: (719)254-3900 <br /> LLC' <br /> Fax: (719)254-3901 <br /> Quote To: VALCO Estimate No: HC1003 <br /> Tom Brubaker Quote Date 11/1/2019 <br /> Date of Plans 6/13/2011 <br /> Revision Date: <br /> Phone: 719-469-0840 <br /> Fax: <br /> Volumes from Draft Deere&Ault Plans <br /> ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT <br /> 1 Mobilization 1.00 LS 61,714.80 61,714.80 <br /> 2 Dewatering 1.00 LS 1 31,478.601 31,478.60 <br /> 3 Pond C Fill-In 68,500.00 CY 2.08 142,480.00 <br /> 41 Pond D Fill-In 205,000.00 CY 2.08 426,400.00 <br /> GRAND TOTAL $662,073.40 <br /> NOTES: <br /> HC assumes that Valco will supply 12"pumping equipment and all electric wiring and hookup. The anticipated pump is a <br /> Large Portable Electric 12" Submersible Pump capable of pumping between 4,000 and 5,000 GPM for the anticipated site <br /> conditions.The pump system is designed to float just below the surface of the water. The pump system is not anticiated to <br /> have to pump to any elevations higher than 30 feet above the pump.HC has included costs to furnish,install,and hook up a <br /> maximum of 1,200 feet of 16"HDPE piping.HC included costs to rent a fusing machine for 1 week to connect the pipe <br /> sections. A 330 Excavator will be provided to set and move the pump. A laborer will be provided to monitor the pump for the <br /> duration of the project.HC has has not included costs to comply with any special requirements of a dewatering permit if <br /> required. <br /> HC has included costs to complete the excavation work in a manner that creates positive drainage towards the existing pond <br /> areas to prevent stormwater from flowing offsite.Berms,straw bales,or erosion logs will be used as BMPs in areas where <br /> stormwater may leave the site. <br /> Existing topsoil will be salavged and placed on fill areas. <br /> EXCLUSIONS: <br /> Bonding,Traffic Control,Materials Testing,Permitting,Licensing,Construction Fence,QA/QC, Seeding,Mulching, <br /> Herbicide/Weed Control,Erosion Control(Other than items referenced above),Electrical Work,Engineering,Import <br /> Aggregates or Topsoil. <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.