My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-21_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2019-11-21_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 2:28:00 PM
Creation date
11/21/2019 10:59:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
11/21/2019
Doc Name
Inspection Report
From
DRMS
To
Twentymile Coal, LLC
Inspection Date
11/13/2019
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 13, 2019 G1982-056/Foidel Creek Mine TNL <br /> Pond F Y N runoff from Foidel outlet of pond some, some dirt to <br /> facilities clear out <br /> Pond G Y N Surface Runoff Foidel at entrance <br /> from laydown <br /> Area <br /> Pond E Y Y delta at inlet cleaned <br /> Area No. 1 Pond Y N mine, sumps, Pond D Waste pile under-drain was not <br /> (Pit Pond) diversion dich discharging <br /> Pond D Y Y <br /> Pond B Y Y Bob pile Foidel 3 cell pond, deltas,frequent clean <br /> out <br /> Pond C N N Cleared to seed shortly <br /> Pond T Y N laydown area Foidel v-notch weir, culvert under <br /> railway always trickling <br /> Water Treatment Y Y facilities water leach <br /> ponds field <br /> Stream buffer zone ok <br /> L@ truck load-out <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Maintenance items: <br /> • Clear Sump to Pond B <br /> • Clear Delta at inlet of pond E <br /> • Grade and reseed 3 topsoil piles at 9E <br /> • SMN pad reseed <br /> • Vegetation is spare at the 9E Utility Borehole and will need to be(re)seeded. <br /> • 9E culverts need to be cleared <br /> • 9E needs additional disturbance boundary markers <br /> • Topsoil pile that was moved to accommodate the waste pile expansion needs to be shaped and seeded. <br /> • Culvert F-4(A)appears to have been hit by a dozer and needs to be repaired again. <br /> • Topsoil piles on new borehole pads,which were damaged by cattle,need to be shaped and seeded. <br /> New items to address from this inspection: <br /> • The thickener underflow pipeline appears to be all or mostly installed. This pipeline disturbance needs to <br /> be seeded. <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.