My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-20_REVISION - M2004044 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004044
>
2019-11-20_REVISION - M2004044 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 2:26:13 PM
Creation date
11/21/2019 9:19:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004044
IBM Index Class Name
Revision
Doc Date
11/20/2019
Doc Name
Adequacy Review Response
From
Aggregate Industries
To
DRMS
Type & Sequence
AM1
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mine Phasing <br /> Aggregate Industries anticipates mining and reclaiming the proposed Tucson South Resource site in approximately 5 <br /> to 10 years. The rate of mining and overall life of the mine is dependent on several factors including product demand <br /> and operational needs. Test pits have verified that commercial deposits of sand and gravel exist up to 50 feet below <br /> the surface of the ground. In addition to the commercial sand and gravel materials,clay,silt, and other non- <br /> marketable materials excavated from the proposed permit area will be used on-site for reclamation. <br /> The mining plan currently includes mining in three phases. Mining will occur simultaneously in more than one phase. <br /> The actual sequence may change depending on market conditions,operational needs,or site conditions: <br /> • West Area(Phase 1), is located north of Highway 7 and west of Tucson Street and included Tracts A, B and <br /> C <br /> • East Area(Phase 2)is north of Highway 7 and east of Tucson Street and includes Tracts D, E, F, G and H <br /> • South Area(Phase 3),is located south of State Highway 7,and included Tract I <br /> Tract J will contain the conveyor to carry product off-site to the processing facility at the Wattenberg Lakes Site and <br /> will be used during all mining phases. <br /> Mining will begin in the West Area(Phase 1,88.6 acres)will be mined from south to north. The East Area(Phase 2- <br /> 139.4 acres)will be mined from south to north. All necessary permits will be obtained,and any required special <br /> construction techniques will be used prior to disturbance in any jurisdictional Waters of the U.S. A summary of <br /> mining phases is presented in the table below. <br /> The South Area(Phase 3,24.3 acres)and mined from the east to the west utilizing a dry mining technique(i.e. <br /> dewatering). Material will be transported across Highway 7 to the West Area for conveyance to the Wattenberg <br /> Lakes Mine(M-2004-051). Processing and sale of the material will occur on the Platte Valley site(M-1989-120). <br /> When mining in the South Area is complete,overburden from the West and East Areas will be trucked across <br /> Highway 7 and used to back fill the South Area to create an upland meadow. <br /> A slurry wall will be constructed around the East and West Areas prior to exposure of the water table.The final <br /> design of the slurry wall is pending and will be provided to the DRMS prior to exposing the water table. <br /> Mine Phasing Summary <br /> Mine Phase Permit Boundary Affected Area Mined AreaTo be Duration <br /> mine acres ears <br /> South 24.3 24.3 14.7 2 <br /> West 137.6 88.6 72 4 <br /> East 139.4 139.4 83.8 4 <br /> Conveyor 3.3 3.3 0 <br /> Tucson Street 2.9 2.9 0 <br /> Total 307.5 258.5 170.5 10 <br /> Mining Methods <br /> Aggregate Industries Tucson South Resource <br /> Permit#M-2004-044 112 Permit Amendment <br /> Page D-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.