My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-20_REVISION - M2004044 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004044
>
2019-11-20_REVISION - M2004044 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 2:26:13 PM
Creation date
11/21/2019 9:19:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004044
IBM Index Class Name
Revision
Doc Date
11/20/2019
Doc Name
Adequacy Review Response
From
Aggregate Industries
To
DRMS
Type & Sequence
AM1
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ineffective flow areas are also known as"backwater"areas. These areas flood when the water surface elevation <br /> increases,but do not actively convey flows downstream. Ineffective flow areas have essentially no flow velocity. <br /> Ineffective flow areas are typically found upstream and downstream of bridges and culverts as flow contracts and <br /> expands through the opening. Because they do not convey flow downstream, these areas can be filled or altered <br /> without impacting flood water surface elevations. Stockpiles in other locations, which are in active flow areas, are <br /> oriented to be parallel to the direction of flow to minimize impacts to the flood water surface elevations. Since the <br /> stockpiles are located in areas where alterations are not expected to impact the flood water surface elevations,their <br /> orientation and length are not restricted such as the stockpiles in active flow areas. A schematic figure <br /> demonstrating the ineffective flow areas around a bridge is presented below. <br /> Cross Section <br /> Contracting Flow Cross Section <br /> i <br /> n <br /> --_dross Section <br /> � <br /> l Ineffective <br /> Flow Area <br /> (Typical All <br /> 0/ ` '•, Shaded <br /> Expanding Flow \'' Areas) <br /> \. Cross section <br /> - - -- tQ <br /> Additional mining and reclamation procedures will be used within the regulatory floodplain to mitigate impacts from <br /> potential flood flows. Flood season is considered to be April 1 through September 30. The southern and eastern <br /> slopes of each area will either be maintained at 31-1:1 V during the flood season during mining or concurrently <br /> reclaimed at 31-1:1 V with reclamation backfill. This restriction only applies for areas within 400 feet of the South Platte <br /> River in accordance with DRMS policy. If flood waters reach the mining Areas prior to complete reclamation,the <br /> 31-1:1 V slopes will allow controlled flow into the Areas while reducing the potential for head cutting and capture of the <br /> South Platte River. <br /> A Floodplain Use Application has been issued by Adams County for this project. Adams County is the <br /> regulating authority on the flood permit; however, Adams County may request review and comment from <br /> Urban Drainage and Flood Control District(UD&FCD). Comments and revisions from the County or the <br /> UDFCD will be incorporated into the final Floodplain Use Permit <br /> Each aspect of the mining operation is listed in the following table with associated disturbed area. The table <br /> illustrates a point in time when the mining disturbance could be at its maximum. At the proposed Tucson South <br /> Resource site, it is assumed that the mining disturbance will be at its greatest when the East Area mining is nearly <br /> complete. That will be a time when the slurry wall is installed and,topsoil replacement and initial seeding will be <br /> completed for the West Area. <br /> Aggregate Industries Tucson South Resource <br /> Permit#M-2004-044 112 Permit Amendment <br /> Page D-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.