Laserfiche WebLink
EXHIBIT D RECLAMATION PLAN <br /> The Detroit City Mine will be reclaimed back to the alpine woodland that it was prior to mining. <br /> For areas below treeline, this will involve the restoration of topsoil and revegetation of alpine <br /> grasses. Above treeline this will involve establishing permanently stable slopes and grades. This <br /> revised reclamation plan will reflect the increase in the permit area from 4.99 acres to 10 acres. <br /> 1. Overburden Handling <br /> This subsection is unchanged from the currently approved permit. Information for this subsection <br /> can be found in the following locations of the existing permit file: <br /> Document Exhibit Subsection/itemdate <br /> 110(1)App D 1 D-1 2017-02-10 02/10/17 <br /> 2. Reclaimed Slopes <br /> This subsection is unchanged from the currently approved permit. Information for this subsection <br /> can be found in the following locations of the existing permit file: <br /> Document Exhibit Subsection/itemdate <br /> 110(1)App D_ 2 D-1 2017-02-10` 02/10/17 <br /> Adeq. Response 1 39 ! 7 2017-04-19 04/19/17 <br /> Adeq.Response 2 — 10,11 3 2017-05-19 05/19/17 <br /> 3. Revegetation <br /> This subsection is unchanged from the currently approved permit. Information for this subsection <br /> can be found in the following locations of the existing permit file: <br /> D. date <br /> 110(1)App D 3 D-1 2017-02-10 02/10/17 <br /> Adeq. Response 1 27,28,29,30, 5, 6,7 2017-04-19 04/19/17 <br /> _ 36,37, 38 <br /> Adeq.Response 2 13,14,15 3,4 2017-05-19 05/19/17 <br /> Detroit City Mine Gmg lAwitW wd e.wd.ta.P A' <br /> October 2019 D-1 <br />