Laserfiche WebLink
EXHIBIT D -Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E-Map. <br /> 1) Primary future (Post-mining) land use(check one): <br /> Cropland (CR) _a Pastureland (PL) General Agriculture (GA) <br /> Rangeland(RL) Fj Forestry(FR) F] Wildlife Habitat(WL) <br /> Residential (RS) n Recreation (RC) -a Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Mine Portal will be collapsed, approximately 74 cubic yard of material will be needed to reclaim <br /> portal, pad and road to private property. Back slope will be re-graded to work with existing contours <br /> or at a 3H-1V_ Availahip tnp snit will distrihutPd armss disturhPd area and rP-seeded (See item 11) <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 3 H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: IV (example 1 H:1 V, 2H: IV, etc.), please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> Approximately 74 cubic yard of material will be needed to reclaim portal, pad and road to private <br /> prnperty_ Material will he salvaged from dump slopes and graded to 1H- 1 V (SPP Item 11) <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches =6-8 inches <br /> 8-10 inches F_J_ 10-12 inches <br /> Other: <br /> N/A, explain: it that available will distributed bed <br /> p�v r n-m -rra va Frur urca--uc�vsr <br />