My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-15_PERMIT FILE - M2017044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017044
>
2019-11-15_PERMIT FILE - M2017044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 6:32:42 AM
Creation date
11/18/2019 11:30:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017044
IBM Index Class Name
PERMIT FILE
Doc Date
11/15/2019
Doc Name
Incompleteness Response
From
McFarland Enterprises
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C -Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: 7/15/2018 and completion: 9/30/2028 <br /> 2) How many years is the mine anticipated to be operational: 10 years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> ([:[) all-yearlong or(ED seasonally, explain: Activities preformed while weather permits <br /> 4) How many aces of the mine site will be disturbed at any given time: 0.713 acres <br /> 5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches =6-8 inches <br /> 8-10 inches =10-12 inches <br /> Other: None <br /> N/A, explain. <br /> 6) Will you need to move any overburden (check one): (_[:])Yes or(2L)No <br /> a. If yes,approximately how thick is the overburden? feet <br /> 7) How will the mine be accessed: ( ✓a) existing roads (n) new roads will be created <br /> Please describe the existing roads: <br /> Existing road through� private property <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> Plarement of two eighteen inch rulvert and water hars,, <br /> 8) Will water be needed during the mining operation (check one): (-a)Yes or (- )No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): (]a)Yes or( F-1 )No <br /> a. If yes, please describe the water diversions or impoundments: <br /> Placement of three eighteen inch culvert and water bars 12" straw wattles and silt fencing <br /> to prevent undue eroSion to pad and currounding the portal area_ <br /> 10)Will any chemicals be used during the mining process (check one): (_L:]-)Yes or(-EL)No <br /> a. If yes, please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.