My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-14_GENERAL DOCUMENTS - C1981012
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981012
>
2019-11-14_GENERAL DOCUMENTS - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 2:11:14 PM
Creation date
11/15/2019 8:05:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
11/14/2019
Doc Name Note
For RN7
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
New Elk Coal Company, LLC
Permit Index Doc Type
Findings
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of surface drainage with a discharge from underground workings will occur (4.05.2(3)(b)(ii)). <br /> The small areas to be exempted are located as follows: <br /> • SAE at slurry well site and other small areas on the west side of the permit area <br /> • Two SAEs for East Portal Water Tanks <br /> • SAE south of Pond 007A <br /> • SAE east of the Development Coal Waste Pile <br /> • SAE north of the river and west of the RDA belt(including Topsoil Stockpile 42) <br /> • Two SAEs east of the RDA <br /> • SAE approximately 1,500 feet east of Pond 08. <br /> Stream Channel Diversions <br /> During a previous permit term the operator submitted design details for permanent diversion of <br /> the Middle Fork of the Purgatoire River. This diversion was necessary to accommodate coal <br /> storage and preparation plant operations. The Division approved this permanent diversion and <br /> the operator completed the approximately 580-foot diversion in the spring and early summer of <br /> 1985. This decision is based on a finding that the proposed diversion meets the requirements of <br /> 4.05.18 and 4.05.4; applicable local, State, and Federal statutes and regulations; and that the <br /> diversion is designed to safeguard public safety and to minimize adverse impacts to the <br /> hydrologic balance (4.05.4(1) and (4)). The Division has found that this diversion will not <br /> diminish downstream water rights and meets the requirements of Rule 4.05.4(3). Exhibit 21 of <br /> the PAP (Supporting Information for Permanent Diversion) contains the pertinent design <br /> information. <br /> Channel linings, sediment ponds, and channel roughness structures are proposed for use to <br /> control erosion. These means are proposed to be approved by the Division since they are <br /> necessary to control erosion, they are stable, and will require infrequent maintenance <br /> (4.05.4(2)(a)). <br /> Sedimentation Ponds <br /> With TR-68 (issued February 2015),the Division approved the retention of Ponds 004A and 08. <br /> Surface and Ground Water Monitoring <br /> The applicant will conduct monitoring of water in a manner approved by the Division. The <br /> groundwater monitoring plan and surface water monitoring plan are described in Section 2.05 of <br /> the PAP. This section includes monitoring frequency in Table 27 and a water quality parameter <br /> list in Table 28 (4.05.13(1)). <br /> Transfer of Wells <br /> No exploration wells have been transferred to monitoring well status since RN-06. <br /> New Elk Mine <br /> November 2019 Findings for RN-07 <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.