Laserfiche WebLink
TUCSON SOUTH PROPOSED GRAVEL MINE STABILITY ANALYSIS <br /> SLOPE STABILITY ANALYSIS - PIPELINE (NORTH SIDE OF EAST CELL) <br /> TETRA TECH <br /> (Pcf) (P5f) (0) <br /> 17 Claystone Bedrock Mohr-Coulomb 134 100 28 <br /> (peak strength) <br /> ■ Overburden Mohr-Coulomb 126 50 28 <br /> Sand and Gravel Mohr-Coulomb 137 0 35 <br /> ■ Slurry Wall Mohr-Coulomb 122 0 0 <br /> ■ Weathered Claystone Mohr-Coulomb 134 0 14 �35 ft�pipeline Easement <br /> Bedrock(residual �4-20 ft 15 ft►{ 20 ft <br /> strength) 2.09 Pipeline <br /> 4,967_— � <br /> 4,957 <br /> 4,947 <br /> 4,937 <br /> 4,927 <br /> 4,917 <br /> 2 4,907 <br /> 4,897 <br /> 4,887 <br /> 4,877 <br /> 4,867 <br /> -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 <br /> Distance (ft) <br /> Figure D-1 - Static Analysis <br />