My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12_REVISION - M2004044 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004044
>
2019-11-12_REVISION - M2004044 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 6:22:11 AM
Creation date
11/12/2019 1:01:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004044
IBM Index Class Name
REVISION
Doc Date
11/12/2019
Doc Name
Adequacy Review Response #3
From
Aggregate Industries
To
DRMS
Type & Sequence
AM1
Email Name
JLE
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) The Operator/Applicant shall provide an estimate of the project water requirements including flow rates and <br /> annual volumes for the development, mining and reclamation phases of the project. <br /> Water use at the site is governed by the current well permit(Permit No. 81342-F) and the associated Substitute <br /> Water Supply Plan(SWSP)for the site. Water use will be at its highest during the mining phase of the project. <br /> Mining at the site will intercept groundwater tributary to the South Platte River. Consumptive uses of groundwater at <br /> the site include evaporation from groundwater exposed to the atmosphere,water retained in material hauled off sites, <br /> and water used for dust control. <br /> Evaporative losses at the site are attributable to exposed groundwater in the dewatering trenches in the West and <br /> East Areas, in the settling ponds, and the dewatering trenches will be constructed following completion of the slurry <br /> walls surrounding the West and East Areas. The maximum exposed surface area during the life of the mine is equal <br /> to the combined total mined area of the South Area,the dewatering trench surrounding the West Area, and the <br /> settling pond associated with the West Area. The maximum exposed surface area during the life of the mine is <br /> estimated at 18.5 acres. Additional exposed groundwater from the old Tucson Pit(DRMS Permit No. M-1991-140) <br /> has been incorporated into the permit boundary of the Tucson South Pit. Therefore,the maximum exposed <br /> groundwater allowed pursuant to the approved well permit is 25 acres. <br /> Evaporative losses were calculated as the difference between gross evaporation and effective precipitation. The <br /> NOAA Technical Report NWS 33, Evaporation Atlas for the Contiguous 48 United States(U.S. Department of <br /> Commerce)was used to determine the site's average annual gross evaporation of 43 inches. Precipitation was <br /> obtained from the Colorado Climate Center for the Brighton weather station. The gross annual precipitation for this <br /> site was determined to be 14.55 inches. Effective precipitation was calculated as 70 percent of gross precipitation; <br /> thus,the average annual effective precipitation was determined to be 10.19 inches. The maximum total annual <br /> evaporative consumptive use at the site is estimated at 68.25 acre-feet. <br /> The maximum annual production at the site is estimated at 1.25 million tons. The anticipated maximum volume of <br /> water lost in the material hauled off-site is 60 acre-feet per year. The maximum annual operational water <br /> consumptive use due to the mining operation is estimated at 65 acre-feet per year. Maximum dust control <br /> requirements at the site are estimated at 5.0 acre-feet per year. The mine will be at the highest production during the <br /> months of May through August, and in combination with the weather, this period will require the greatest amount of <br /> dust control: The mine will be in production year-round and therefore dust control may be required during all months. <br /> The maximum annual consumptive use from mining at the site authorized by the well permit is 133.25 acre-feet per <br /> year as shown in the following table. <br /> Evaporation 68.25 acre-feet <br /> Moisture Retained in Product 60.00 acre-feet <br /> Dust Control 5.00 acre-feet <br /> Total 133.25 acre-feet <br /> It is not anticipated that additional water will be required for reclamation of the site. Once reclamation is completed, <br /> the City of Aurora will use decreed water rights to fill the ponds. <br /> (4) The Operator/Applicant shall indicate the projected amount from each of the sources of water to supply the <br /> project water requirements for the mining operation and reclamation. <br /> Aggregate Industries(AI)currently maintains a substitute water supply plan approved through the Office of the State <br /> Engineer for its mining operations along the South Platte River and its tributaries. Until the liners surrounding the <br /> West and East Areas of the project have been approved by the State Engineer, and the South Area has been fully <br /> Aggregate Industries Tucson South Resource <br /> Permit#M-2004-044112 Permit Amendment <br /> Page G-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.