Laserfiche WebLink
yy` <br /> i. <br /> �4 <br /> HENDERSON MINE > .. <br /> F <br /> h <br /> j / <br /> `1 <br /> t _ , <br /> a t —.. 4 <br /> �; �q PLANT SERVICES <br /> a <br /> POTABLE <br /> WATER BUILDING - <br /> fff <br /> SURFACE <br /> WAREHOUSE <br /> MAINTENANCE SHOP <br /> AND WAREHOUSE <br /> 0 <br /> E <br /> U <br /> N <br /> Q' <br /> N <br /> C <br /> 1 1 11 111 11 111 <br /> X <br /> E <br /> MAP FEATURES SI TOR N N REVISION DATE Climax Molybdenum <br /> o <br /> MINION PROPOSEDADDITIONAL <br /> AFFECTED LAND BOUNDARY A Freeport-McMoRan Company <br /> AFFECTED LAND BOUNDARY SI NAruRE HENDERSON OPERATIONS o <br /> Aaron Hilshorst 1746 County Road M <br /> - STREAM/DITCH NAME Empire, Colorado 80438 <br /> a) <br /> Chief Environmental Engineer, <br /> MIN i PROPERTY BOUNDARY Henderson Operations Exhibit CA <br /> = <br /> - LAKE/POND TITLE Pre-Mining and Mining Plan <br /> Map of Affected Lands <br /> _ BUILDING Pursuant to Rule6.2.1(2)(b),this map v <br /> has been prepared under my direction as SCALE: inch = 567 feet <br /> _ aregisteredlandsurveyor,professional DESIGNED BY: <br /> RECONCILED'AM-07 ACREAGE engineer,or other qualified person. Q <br /> 1111 W.1611 Ave.,Unit E <br /> Arvada,CO 80002 DRAWN BY: MT <br /> A_C :U,i�O n1X ao.aquio ix.o COORD. SYSTEM: WGS 1984 °' <br /> www.aquionix.com — CD <br /> DATE DRAWN: 9/20/2019 Web_Mercator_Auxiliary_Sphere <br /> g <br />