REVISED
<br /> RECLAMATION
<br /> ;:.,k
<br /> PLAN �:z. ;
<br /> � .� �' � ROUTT COUNTY
<br /> \ \ _ \ PUBLIC WORKS
<br /> NW 1 SECTION 12 T6N R88W 6TH PM '\ \ \\\ = ,; ';' ' = ByP ENT
<br /> \ NEW MINING _
<br /> 4 BOUNDARY
<br /> ROUTT COUNTY, COLORADO _-- i ,;
<br /> \ .
<br /> NEW
<br /> FUNK GRAVEL PIT , ' -��° - ' " i _ BOUNDARY
<br /> G
<br /> / — — — —
<br /> EXISTING ACCESS ROAD >v v v A -?' — -•e+ao _ AI
<br /> TO BE RECLAIMED BY 1
<br /> OTHERS. \\
<br /> ,
<br /> ^
<br /> !,� -dA6 ,\ \ \ \ �,.. 1 SEED ANb MU CH ALL /+ i .r
<br /> 4:1 LOP / / \ \ \ \\ ° SLOPES ANDISTURBE0. ��
<br /> \ A& AS WITH APPROVED_' p��_---- ,
<br /> SET
<br /> 100 50 0 100 200 A eko °kT. e`k' R6
<br /> U
<br /> NEW MINING
<br /> SCALE: 1"=100' ���gh �,�- ' \�S \f�\`` \:. BOUNDARY J W
<br /> 6475
<br /> . ' m
<br /> 4
<br /> SEED AND MULCH ALL O L�
<br /> \ { V •�� /.!f'y�i3� / ii / SLOPES AND
<br /> SEED AND MULCH ALL DISTURBED AREAS WITH
<br /> SLOPES AND A I 1\ Y. / VA\ / / / w / / / APPROVED SEED MIX Q
<br /> DISTURBED AREAS WITH
<br /> NOTES: APPROVED SEED MIX �\I�II \\\\ ;`I'1 , '/ / ,� .:.\ ////o•////// / // // eF�o
<br /> \ \ � - ,l, !ii `" y/ /� // / / / d•N EW MINING Q Z
<br /> PHASE 2 -- �" - I .1,,SLOPS II - ///// / /,;..// / BOUNDARY J
<br /> THE MINING WILL ADVANCE TO THE SOUTH ABOUT 700' FROM THE ELEVATION OF 8450 ON THE SOUTHERN LIMITS OF PHASE 2. NEW MINING I \ �� ',\
<br /> THE FINAL GRADING WILL BE DONE WITH THE SLOPES RECLAIMED AT A RATIO OF 4:1 (HORIZONTAL:VERTICAL). THE OVERBURDEN BOUNDARY - ;1 ,,;.r--�--. /, 'R LI—I O
<br /> STOCKPILE WILL BE USED TO ACCOMPLISH THIS. MOST OF PHASE 2 WILL NOT BE RECLAIMED BEFORE THE NEXT PHASE STARTS. �,1 L I f EXISTIN - // �IgP eA e 8 ' :1 SLOPE U
<br /> RECLAMATION OF ANY AREA NOT IN USE WILL BE DONE AS SOON AS POSSIBLE. THE SLOPES WILL BE CUT TO 2:1 \ \\ \ b�o �� MINING FAC/, ////// / �/ /�
<br /> (HORIZONTAL VERTICAL) TO GENERATE AS MUCH GRAVEL AS POSSIBLE. THIS SLOPE WILL THEN BE FILLED WITH OVERBURDEN
<br /> MATERIAL TO BRING IT TO A 4:1 SLOPE WHEN MINING OPERATIONS ARE COMPLETED. THE BOTTOM OF THE PIT WILL HAVE A 19.
<br /> SLOPE AND DRAIN TO THE NORTH.
<br /> TOPSOIL AND OVERBURDEN WILL BE STOCKPILED TO THE SOUTH IN AN AREA OF ABOUT 2.0 ACRES AND A DEPTH OF 10 FEET. '
<br /> THE TOPSOIL AND OVERBURDEN STOCKPILE WILL HAVE SLOPES THAT ARE FLAT ENOUGH TO ACCOMMODATE MOWING MACHINERY.
<br /> THE TOPSOIL AND OVERBURDEN STOCKPILE WILL BE SEEDED AT THE END OF EACH YEARLY CONSTRUCTION DISTURBANCE TO '& %, 1\I ///1//l l SEED AND MULCH ALL O
<br /> ... ! i // / I PREVENT EROSION. HOWEVER, DURING THE FRST SLOPES AND
<br /> YEAR OF OPERATION (PRESUMABLY 2020), THE SEEDING OF THE TOPSOIL AND N`I-. 'X ' ,\�= '�4 / /// N
<br /> OVERBURDEN STOCKPILE SHALL BE DELAYED UNTIL SPRING OF 2021, SPRAYING AGAINST NOXIOUS WEEDS WILL BE DONE IN _ _/\ --: / // / -- DISTURBED AREAS WITH LL
<br /> ACCORDANCE WITH ROUTT COUNTY'S WEED SPRAYING PROGRAM. THE TOTAL DISTURBANCE IN PHASE 2 IS ESTIMATED TO BE APPROVED SEED MIX
<br /> ABOUT 6 ACRES. A PERIMETER DITCH WITH CHECK DAMS WILL BE USED TO INTERCEPT RUNOFF WATER. / .�,-c7•
<br /> SEED AND MULCH ALL 1 / ' \ —— 1 / 11 I l \ g
<br /> PHASE 3 SLOPES AND DISTURBED �—
<br /> AREAS WITH APPROVED I — _ If/ 1 I $ 4:1 SLOPE
<br /> SEED MIX 'I
<br /> THE MINING WORK WILL BE DONE AT 2:1 SLOPES. AT THE COMPLETION OF MINING OF THIS PHASE, THE SLOPES TO THE EAST
<br /> AND NORTH WILL BE SET AT 4:1 (HORIZONTAL VERTICAL) WITH THE EXISTING OVERBURDEN. TOPSOIL WILL BE TAKEN FROM THE
<br /> RESERVE PILE AT THE SOUTHEAST AREA OF THE SITE. THE SEED MIXTURE WILL BE OF NATIVE GRASSES AS SPECIFIED IN THE MIX \ V/ / �_ \\ \ I 1 4
<br /> DESIGN FROM THE SOIL CONSERVATION SERVICE. THE SLOPE OF THE FLOOR WILL BE AT ABOUT 1%AND WILL DRAIN TO THE WEST. 1 I/ I I
<br /> THE TOTAL SURFACE DISTURBANCE IN PHASE 2 AND 3 IS ESTIMATED AT ABOUT 16.25 ACRES
<br /> NEW MINING I ( \ \\
<br /> GENERAL NOTE: BOUNDARY $L-0IdE
<br /> STRAW BALES AND WATTLES I -I
<br /> 1 l ( / l wv vI III
<br /> AS A NOTE TO THE SUGGESTED RECLAMATION PLAN, ANY STRAW BALES OR WATTLES USED ANYWHERE IN THE PERMITTED AREA, ( \y �•--I % //% '` ��\ \�\ 1,11
<br /> SHALL BE CERTIFIED WEED FREE, INCLUDING JOINTED GOAT WEED. l \ /r� - \� \1
<br /> / \ \ III Date 08.26A9
<br /> AT THE COMPLETION OF MINING SLOPES ON THE WEST AND NORTH SIDE SHALL BE SET AT 4:1. THE FLOOR OF THE PIT SHALL BE \ �' a0 �;—� I I / NEW MINING ����,yq��
<br /> %' l z a d�: Y C RECLAIMED AT A SLOPE OF 1%, GENERALLY FALLING TO THE NORTH AND WEST. \I / /, ) -E 1J SEED AND,MULCH/ALI, \\� li�I 1 I I IfIlll BOUNDARY Reviewed B MTM
<br /> SEED MIX 1 //D , / AREAS W( D/ A,b�FD // ^y/ /,\\\\\ Il I! 1 Job No. 9 ----
<br /> /'"/ SEED MIX Flie ---
<br /> (FROM U.S.D.A, NATURAL RESOURCES CONSERVATION SERVICE, STEAMBOAT SPRINGS, CO) ,+ scal.NOrO6 2O»
<br /> NA i ]III
<br /> cccrIrc R OF MIX PLS LBS[gQRE V IiI
<br /> )
<br /> SMOOTH BROMEGRASS MANCHAR 25 3.5 I / /Al l / / \\�'�/11) I SEED AND MULCH ALL
<br /> PUBESCENT WHEATGRASS LUNA 50 7.0 Ii� Revisions
<br /> STREAMBANK SODAR 25 3.0 \ ; 1 1 SLOPES AND DISTURBED
<br /> AREAS WITH APPROVED 10N OF RECLAMATION
<br /> THE ABOVE SEEDING RATES ARE BASED ON BROADCAST RATES. IF THE SITE IS DRILLED, THEN REDUCE THE ABOVE RATES BY \ \ I l / I 1 1 I 1 SEED MIX
<br /> \ \\ 4.1 $LOPE 1 , ' MINING&SAFETY
<br /> ONE HALF. AFTER SEED IS BROADCAST, THE AREA SHOULD BE LIGHTLY HARROWED OR DUG OVER WITH A LOG CHAIN TO HELP / $ :S SEED AND D DISTURBED
<br /> ALL \
<br /> COVER SEED. AFTER HARROWING, THE SITE SHOULD BE FERTILIZED WITH A MINIMUM OF 40-10-5 AVAILABLE FERTILIZER MIX. \I \I SLOPES AND DISTURBED I
<br /> AFTER FERTILIZING, THE SITE SHOULD BE COVERED WITH STRAW MULCH AT A RATE OF 2.500 LBS PER ACRE. AFTER THE STRAW - \ 3 E a AREAS NTH AP,PRpVED
<br /> IS SCATTERED EVENLY OVER THE SITE, THE STRAW SHOULD BE DISKED TO CRIMP IT INTO THE SOIL. THE MULCH WILL PROTECT /1 I/ I I SEED MIX 1/t I 1
<br /> THE SOIL FROM DRYING AND CRACKING, THUS GIVING THE GRASS SEEDLINGS A BETTER ENVIRONMENT TO GET ESTABLISHED IN.
<br /> THE SEEDING OF THE SITE SHOULD BE DONE IN THE SPRING OR THE FALL OF THE YEAR. FOR THE FIRST GROWING SEASON A / 1 M� •'� / i SEED AND MULCH ALL
<br /> HERBICIDE SHOULD BE USED TO CONTROL ANNUAL BROADLEAF WEEDS. A RECOMMENDED MIX IS 1/10 OZ OF ALLY MIXED WITH 1 �\ / / M�Q e� l v \ SLOPES AND DISTURBED Sheet
<br /> 1/3 LB OF 2,4—D. SPRAYING SHOULD BE DONE DURING THE FIRST WEEK OF JUNE. \ / / ekb eye \\ AREAS WITH APPROVED
<br /> ♦ \ / / I — °�°° &°�� eyp _ SEED MIX
<br /> NEW MINING 4:1 SLOPE
<br /> BOUNDARY Rp
<br />
|