Laserfiche WebLink
REVISED <br /> RECLAMATION <br /> ;:.,k <br /> PLAN �:z. ; <br /> � .� �' � ROUTT COUNTY <br /> \ \ _ \ PUBLIC WORKS <br /> NW 1 SECTION 12 T6N R88W 6TH PM '\ \ \\\ = ,; ';' ' = ByP ENT <br /> \ NEW MINING _ <br /> 4 BOUNDARY <br /> ROUTT COUNTY, COLORADO _-- i ,; <br /> \ . <br /> NEW <br /> FUNK GRAVEL PIT , ' -��° - ' " i _ BOUNDARY <br /> G <br /> / — — — — <br /> EXISTING ACCESS ROAD >v v v A -?' — -•e+ao _ AI <br /> TO BE RECLAIMED BY 1 <br /> OTHERS. \\ <br /> , <br /> ^ <br /> !,� -dA6 ,\ \ \ \ �,.. 1 SEED ANb MU CH ALL /+ i .r <br /> 4:1 LOP / / \ \ \ \\ ° SLOPES ANDISTURBE0. �� <br /> \ A& AS WITH APPROVED_' p��_---- , <br /> SET <br /> 100 50 0 100 200 A eko °kT. e`k' R6 <br /> U <br /> NEW MINING <br /> SCALE: 1"=100' ���gh �,�- ' \�S \f�\`` \:. BOUNDARY J W <br /> 6475 <br /> . ' m <br /> 4 <br /> SEED AND MULCH ALL O L� <br /> \ { V •�� /.!f'y�i3� / ii / SLOPES AND <br /> SEED AND MULCH ALL DISTURBED AREAS WITH <br /> SLOPES AND A I 1\ Y. / VA\ / / / w / / / APPROVED SEED MIX Q <br /> DISTURBED AREAS WITH <br /> NOTES: APPROVED SEED MIX �\I�II \\\\ ;`I'1 , '/ / ,� .:.\ ////o•////// / // // eF�o <br /> \ \ � - ,l, !ii `" y/ /� // / / / d•N EW MINING Q Z <br /> PHASE 2 -- �" - I .1,,SLOPS II - ///// / /,;..// / BOUNDARY J <br /> THE MINING WILL ADVANCE TO THE SOUTH ABOUT 700' FROM THE ELEVATION OF 8450 ON THE SOUTHERN LIMITS OF PHASE 2. NEW MINING I \ �� ',\ <br /> THE FINAL GRADING WILL BE DONE WITH THE SLOPES RECLAIMED AT A RATIO OF 4:1 (HORIZONTAL:VERTICAL). THE OVERBURDEN BOUNDARY - ;1 ,,;.r--�--. /, 'R LI—I O <br /> STOCKPILE WILL BE USED TO ACCOMPLISH THIS. MOST OF PHASE 2 WILL NOT BE RECLAIMED BEFORE THE NEXT PHASE STARTS. �,1 L I f EXISTIN - // �IgP eA e 8 ' :1 SLOPE U <br /> RECLAMATION OF ANY AREA NOT IN USE WILL BE DONE AS SOON AS POSSIBLE. THE SLOPES WILL BE CUT TO 2:1 \ \\ \ b�o �� MINING FAC/, ////// / �/ /� <br /> (HORIZONTAL VERTICAL) TO GENERATE AS MUCH GRAVEL AS POSSIBLE. THIS SLOPE WILL THEN BE FILLED WITH OVERBURDEN <br /> MATERIAL TO BRING IT TO A 4:1 SLOPE WHEN MINING OPERATIONS ARE COMPLETED. THE BOTTOM OF THE PIT WILL HAVE A 19. <br /> SLOPE AND DRAIN TO THE NORTH. <br /> TOPSOIL AND OVERBURDEN WILL BE STOCKPILED TO THE SOUTH IN AN AREA OF ABOUT 2.0 ACRES AND A DEPTH OF 10 FEET. ' <br /> THE TOPSOIL AND OVERBURDEN STOCKPILE WILL HAVE SLOPES THAT ARE FLAT ENOUGH TO ACCOMMODATE MOWING MACHINERY. <br /> THE TOPSOIL AND OVERBURDEN STOCKPILE WILL BE SEEDED AT THE END OF EACH YEARLY CONSTRUCTION DISTURBANCE TO '& %, 1\I ///1//l l SEED AND MULCH ALL O <br /> ... ! i // / I PREVENT EROSION. HOWEVER, DURING THE FRST SLOPES AND <br /> YEAR OF OPERATION (PRESUMABLY 2020), THE SEEDING OF THE TOPSOIL AND N`I-. 'X ' ,\�= '�4 / /// N <br /> OVERBURDEN STOCKPILE SHALL BE DELAYED UNTIL SPRING OF 2021, SPRAYING AGAINST NOXIOUS WEEDS WILL BE DONE IN _ _/\ --: / // / -- DISTURBED AREAS WITH LL <br /> ACCORDANCE WITH ROUTT COUNTY'S WEED SPRAYING PROGRAM. THE TOTAL DISTURBANCE IN PHASE 2 IS ESTIMATED TO BE APPROVED SEED MIX <br /> ABOUT 6 ACRES. A PERIMETER DITCH WITH CHECK DAMS WILL BE USED TO INTERCEPT RUNOFF WATER. / .�,-c7• <br /> SEED AND MULCH ALL 1 / ' \ —— 1 / 11 I l \ g <br /> PHASE 3 SLOPES AND DISTURBED �— <br /> AREAS WITH APPROVED I — _ If/ 1 I $ 4:1 SLOPE <br /> SEED MIX 'I <br /> THE MINING WORK WILL BE DONE AT 2:1 SLOPES. AT THE COMPLETION OF MINING OF THIS PHASE, THE SLOPES TO THE EAST <br /> AND NORTH WILL BE SET AT 4:1 (HORIZONTAL VERTICAL) WITH THE EXISTING OVERBURDEN. TOPSOIL WILL BE TAKEN FROM THE <br /> RESERVE PILE AT THE SOUTHEAST AREA OF THE SITE. THE SEED MIXTURE WILL BE OF NATIVE GRASSES AS SPECIFIED IN THE MIX \ V/ / �_ \\ \ I 1 4 <br /> DESIGN FROM THE SOIL CONSERVATION SERVICE. THE SLOPE OF THE FLOOR WILL BE AT ABOUT 1%AND WILL DRAIN TO THE WEST. 1 I/ I I <br /> THE TOTAL SURFACE DISTURBANCE IN PHASE 2 AND 3 IS ESTIMATED AT ABOUT 16.25 ACRES <br /> NEW MINING I ( \ \\ <br /> GENERAL NOTE: BOUNDARY $L-0IdE <br /> STRAW BALES AND WATTLES I -I <br /> 1 l ( / l wv vI III <br /> AS A NOTE TO THE SUGGESTED RECLAMATION PLAN, ANY STRAW BALES OR WATTLES USED ANYWHERE IN THE PERMITTED AREA, ( \y �•--I % //% '` ��\ \�\ 1,11 <br /> SHALL BE CERTIFIED WEED FREE, INCLUDING JOINTED GOAT WEED. l \ /r� - \� \1 <br /> / \ \ III Date 08.26A9 <br /> AT THE COMPLETION OF MINING SLOPES ON THE WEST AND NORTH SIDE SHALL BE SET AT 4:1. THE FLOOR OF THE PIT SHALL BE \ �' a0 �;—� I I / NEW MINING ����,yq�� <br /> %' l z a d�: Y C RECLAIMED AT A SLOPE OF 1%, GENERALLY FALLING TO THE NORTH AND WEST. \I / /, ) -E 1J SEED AND,MULCH/ALI, \\� li�I 1 I I IfIlll BOUNDARY Reviewed B MTM <br /> SEED MIX 1 //D , / AREAS W( D/ A,b�FD // ^y/ /,\\\\\ Il I! 1 Job No. 9 ---- <br /> /'"/ SEED MIX Flie --- <br /> (FROM U.S.D.A, NATURAL RESOURCES CONSERVATION SERVICE, STEAMBOAT SPRINGS, CO) ,+ scal.NOrO6 2O» <br /> NA i ]III <br /> cccrIrc R OF MIX PLS LBS[gQRE V IiI <br /> ) <br /> SMOOTH BROMEGRASS MANCHAR 25 3.5 I / /Al l / / \\�'�/11) I SEED AND MULCH ALL <br /> PUBESCENT WHEATGRASS LUNA 50 7.0 Ii� Revisions <br /> STREAMBANK SODAR 25 3.0 \ ; 1 1 SLOPES AND DISTURBED <br /> AREAS WITH APPROVED 10N OF RECLAMATION <br /> THE ABOVE SEEDING RATES ARE BASED ON BROADCAST RATES. IF THE SITE IS DRILLED, THEN REDUCE THE ABOVE RATES BY \ \ I l / I 1 1 I 1 SEED MIX <br /> \ \\ 4.1 $LOPE 1 , ' MINING&SAFETY <br /> ONE HALF. AFTER SEED IS BROADCAST, THE AREA SHOULD BE LIGHTLY HARROWED OR DUG OVER WITH A LOG CHAIN TO HELP / $ :S SEED AND D DISTURBED <br /> ALL \ <br /> COVER SEED. AFTER HARROWING, THE SITE SHOULD BE FERTILIZED WITH A MINIMUM OF 40-10-5 AVAILABLE FERTILIZER MIX. \I \I SLOPES AND DISTURBED I <br /> AFTER FERTILIZING, THE SITE SHOULD BE COVERED WITH STRAW MULCH AT A RATE OF 2.500 LBS PER ACRE. AFTER THE STRAW - \ 3 E a AREAS NTH AP,PRpVED <br /> IS SCATTERED EVENLY OVER THE SITE, THE STRAW SHOULD BE DISKED TO CRIMP IT INTO THE SOIL. THE MULCH WILL PROTECT /1 I/ I I SEED MIX 1/t I 1 <br /> THE SOIL FROM DRYING AND CRACKING, THUS GIVING THE GRASS SEEDLINGS A BETTER ENVIRONMENT TO GET ESTABLISHED IN. <br /> THE SEEDING OF THE SITE SHOULD BE DONE IN THE SPRING OR THE FALL OF THE YEAR. FOR THE FIRST GROWING SEASON A / 1 M� •'� / i SEED AND MULCH ALL <br /> HERBICIDE SHOULD BE USED TO CONTROL ANNUAL BROADLEAF WEEDS. A RECOMMENDED MIX IS 1/10 OZ OF ALLY MIXED WITH 1 �\ / / M�Q e� l v \ SLOPES AND DISTURBED Sheet <br /> 1/3 LB OF 2,4—D. SPRAYING SHOULD BE DONE DURING THE FIRST WEEK OF JUNE. \ / / ekb eye \\ AREAS WITH APPROVED <br /> ♦ \ / / I — °�°° &°�� eyp _ SEED MIX <br /> NEW MINING 4:1 SLOPE <br /> BOUNDARY Rp <br />