Laserfiche WebLink
- r <br /> � y <br /> South Taylor Pit. <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3),Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5) and <br /> (6)/4.03.2(5)and(6),Reclamation 4.03.1(7)/4.03.2(7): <br /> Plowing activities were observed along secondary access roads. All main haul roads were cleared and functoining <br /> at the time of the inspection. <br /> RECLAMATION SUCCESS -Rule 4.15,Rule 3: <br /> Due to snow depths,the West Pit reclamation was inspected at overlooks.No signs of issues were observed. <br /> 6JM :• <br /> West Pit. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3;Redistribution 4.06.4: <br /> Topsoil Pile 15H has been relocated and temporarily staged in the West Pit. The topsoil will be spread when spoil <br /> regrading has been completed in the surrounding area. <br /> Additional topsoil stripping along the Collom Temporary Excess Spoil Pile footprint has been completed. Topsoil <br /> for this area has been placed along Topsoil Pile 26A. <br />