Laserfiche WebLink
Table 1: Surety Adjustment 02, TR-115 - New Core Shed <br /> Direct Costs <br /> Width Length Height Volume Unit cost RSMeans <br /> Task (ft) (ft) (ft) (CF) (CF) Total Cost Sour of Estimate Reference Comments <br /> Building Demolition,Large Urban project, <br /> Building 40 100 16 64,000 $0.28(CF) $17,920 Steel,incudes 20 mile haul,excludes 024116130020 Buried in a OSA or <br /> Demolition VLF <br /> foundation demolition,deep fees. <br /> Width Length Height Area Unit cost RSMeans <br /> Task Total Cost Sour of Estimate Comments <br /> (ft) (ft) (ft) (SF) (SF) Reference <br /> Building footings and foundations <br /> demolition,floors,concrete slab on <br /> Slab Buried in a OSA or <br /> 40 100 0.5 4000 $.95(SF) $3,800 grade,concrete,wire mesh reinforced,6" 024116170420 <br /> Demolition VLF <br /> thick,excludes disposal costs and dump <br /> fees. <br /> Total Direct Costs: $21,720 <br /> Indirect Costs <br /> Item <br /> All in DRMS Indirect Rate: 18.5% <br /> Total Indirect Costs: $4,018 <br /> Direct+indirect Subtotal: $25,738 <br /> Administrative <br /> Item <br /> DRMS Administrative Rate 5% <br /> Total Administrative Costs: $1,287 <br /> Required Financial <br /> Warranty: $27,025 <br /> RECEIVED <br /> NOV 0 12019 <br /> DIVISION OF RECLAMATION, <br /> MMM AND SAFELY <br />