Laserfiche WebLink
5. Monitoring <br /> First vegetation started to establish throughout the fall of 2015 aided by regular and <br /> above average precipitation. Fig .4 shows site condition in September 2015. <br /> ► . * : �: , <br /> Figure 4: Site conditions as of September 2015,looking north across the project site. First vegetation <br /> established(see Fig. 1,right for comparison). <br /> Fig. 5 shows a close up view of the upper area with leveled and recontoured terrain, logs <br /> for erosion control, and first signs of vegetation. <br />