Laserfiche WebLink
-2- <br /> 9. Primary Mine Entrance Location(report in either Latitude/Longitude OR UTM): <br /> Latitude/Longitude: <br /> Example: (N) 39" 44' 12.98" <br /> (W) 104° 59' 3.87" <br /> Latitude(N): deg min sec (2 decimal places) <br /> Longitude(W): deg min sec (2 decimal places) <br /> OR <br /> Example: (N) 39.736910 <br /> (W) -104.98449° <br /> Latitude(N) 40 07333 (5 decimal places) <br /> Longitude(W) -104 45158 (5 decimal places) <br /> OR <br /> Universal Transverse Mercator(UTM) <br /> Example: 201336.3 E NAD27 Zone 13 <br /> 4398351.2 N <br /> UTM Datum(specify NAD27,NAD83 or WGS 84) Zone <br /> Easting <br /> Northing <br /> it. Primar Present Land Use check only one): <br /> Cropland(CR) [z]Pastureland(PL) ❑General Agriculture(GA) <br /> Rangeland(RL) ❑Forestry(FR) a Wildlife Habitat(WL) <br /> ❑Residential(RS) ORecreation(RC) a Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 10. Primary Future(Post-mining)Land Use(check only one): <br /> 17 Cropland(CR) Pastureland(PL) 1 General Agriculture(GA) <br /> ._]Rangeland(RL) 0 Forestry(FR) n Wildlife Habitat(WL) <br /> L Residential(RS) L Recreation(RC) II Industrial/Commercial(IC) <br /> FIDeveloped Water Resources(WR) <br /> 12. Duration of Project: <br /> 12.1 Estimated beginning date of excavation: 06/05/2019 <br /> 12.2 Estimated completion date of excavation: 12/15/2019 <br />