My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-30_INSPECTION - C1994082
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1994082
>
2019-10-30_INSPECTION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:43:10 PM
Creation date
10/31/2019 6:43:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Inspection
Doc Date
10/30/2019
Doc Name
Inspection Report
From
DRMS
To
OSM & BLM
Inspection Date
10/14/2019
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 14, 2019 C-1994-082/toast Mine RAR <br /> A slump was identified in parcel 2. This parcel is part of a cluster of parcels (28, 66, 59, and 19), slated <br /> for phase II and III release. The slump had stabilized over time as shown in the photo below and no <br /> issues were noted. The slump area had been rescinded in 2012 from a phase I(SL4), and excluded from <br /> SU, a phase III bond release. Phase II and III vegetation sampling occurred simultaneously in 2019 for <br /> this parcel. Vegetation comprised various grasses: wheat grass and orchard grass and mature stands of <br /> sage brush. This area comprises Federal ownership. <br /> W�4 <br /> iG <br /> WlE�vnr <br /> re r <br /> 26 <br /> d <br /> Ili <br /> u <br /> ,� . <br /> .ice. u i <br /> m w <br /> i <br /> t <br /> y n <br /> ow <br /> vu <br /> 14 <br /> Photo S: Inactive slump in Parcel 3. <br /> Continuing south down the haul road we entered a block of phase III parcels (35, 38, 39, 40, and 83). <br /> Constructed drainages YPM 1 to YPM6 were walked into phase II parcels 82 and 77. Vegetation <br /> comprised a diversity of species apropos to the seed mixture and constructed drainages were in good <br /> condition and functioning appropriately. A weedy patch on a south facing slope in parcel 82 was noted <br /> near the constructed drainage,YPM7. The parcel was seeded in 2007 and received phase I in 2017. As <br /> we moved into the confines of the bottom of the draw a stand of Canada thistle was noted,predominantly <br /> on the south facing slope. The operator,as the land owner, committed to treating the area and continuing <br /> to monitor the area after phase III release. <br /> Proceeding out of the draw and up the slope above pond 12A we ascended through parcels 39,40, 83 16, <br /> 33 and 32, also phase III. Vegetation was dominated by desirable species included in the prescribed <br /> seed mix; (wheat grasses and wild rye),pacific aster, sage brush(parcel 16 shrub plot), and an abundant <br /> amount of alfalfa,particularly in parcels 83 and 16 that showed substantial browsing pressure. A swath <br /> of foxtail was observed along drainage YPM5 a series of wire enclosures were noted in parcel 40 as <br /> shown in photo 7 below. The operator agreed to remove these items. The Surge tank ST 1 was dry and <br /> the associated drainage YPM3 and YPM 1 were walked where a number of shrub/tree enclosures were <br /> found to be well established and mature. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.