Laserfiche WebLink
October 22, 2019 C-1983-059/Terror Creek Loadout LDS <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N - Air Resource Protection N -Roads <br /> R - Availability of Records N -Reclamation Success <br /> N - Backfill& Grading N -Revegetation <br /> N - Excess Spoil and Dev. Waste N - Subsidence <br /> N - Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> R - Hydrologic Balance N - Signs and Markers <br /> N - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a complete inspection by Leigh Simmons of the Division of Reclamation, Mining and Safety(Division). <br /> The weather was clear and dry. There was no activity at the site, and no sign of any recent disturbance. The site <br /> was inspected with an Unmanned Aerial Vehicle(UAV, or"drone"). <br /> AVAILABILITY OF RECORDS—Rule 5.02.4(1): <br /> Records were available in the office. Detailed comments are made at the end of this report. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7,4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> Both ponds at the site were dry. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 5 <br />