Laserfiche WebLink
E. Other Disturbances (please describe) <br /> The applicant will install sediment control berms at the portal/shaft pads and at drill pads. <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> Excavation and drilling equipment will be stored on the portal/adit pads. Diesel fuel and lubricants for the equipment <br /> present onsite may include a maximum of approx. 100 gallons diesel, 10 gallons lubricants,one pallet of drilling <br /> additives. These supplies may be delivered by truck daily instead of stored on or near the sites. Any chemicals and <br /> fuels stored onsite will be placed in impermeable secondary containment that is secured and weatherproof. <br /> G. New Roads: <br /> Length (ft): 400 Width (ft): 12 <br /> Significantly <br /> Upgraded Roads Length (ft): Width (ft): <br /> Are culverts or other crossings proposed? If so,please describe: <br /> H. Total project area to be disturbed (acres) 1 .3 <br /> I. Describe the equipment to be used for the prospecting operations: <br /> Excavator, loader, small dozer, 2 drilling trucks, pipe truck,water tanker, crew cab 4x4 truck. <br /> Form 2—Public File Page 7 of 14 <br />