Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company ■■Newr'ields <br /> Squaw Gulch Valley Leach Facility Perspective,Vision.Solutions. <br /> Phase 2A Part 2 Record of Construction <br /> Geomembrane Extrusion Welding Destructive Testing Summary <br /> Welding Data Test Results <br /> Sample Date QA <br /> Date 1 <br /> Number Seam Number Seamed operator Machine Tested Peel Strength Shear Strength' Pass/Fail Monitor Remarks <br /> Number (Minimum=100 ppi) (Minimum=120 ppi) <br /> DX-188 P-2766/P-3166 09/06/19 LZ 54 09/09/19 131 122 108 159 149 186 180 185 189 185 Pass TT 11'S of N EOS <br /> DX-189 P-2728/P-3175 09/11/19 LZ 100 09/12/19 174 137 153 171 172 175 194 191 194 185 Pass TS 10'S of N EOS <br /> DX-190 P-2696/P-3188 09/13/19 LZ 100 09/13/19 136 127 143 142 145 150 160 158 160 153 Pass TS 13'S of N EOS <br /> DX-191 P-3184/P3185 09/13/19 LZ 100 09/14/19 PEEL 151 PEEL - - _ Fail TS DF-1072/D-8496 <br /> DX-191P P-2707/P-3184 09/13/19 LZ 100 09/14/19 127 142 148 148 154 173 178 176 182 178 Pass TS D-8494/D-8593 <br /> DX-191N P-2702/P-2704/P-3186 09/13/19 LZ 100 09/14/19 158 166 170 150 153 172 177 175 168 171 Pass TS D-8501 <br /> Note:DX-187N was not marked because DX-187 was marked at the end of an extrusion welded seam <br /> N - Next <br /> P- Previous Page 3 of 3 1See Figure 4 for Break Modes <br />